| Location: | Texas |
|---|---|
| Posted: | Nov 7, 2024 |
| Due: | Nov 26, 2024 |
| Agency: | City of Carrollton |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ENG 2024 - 005 |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Sealed Bid - Lowest Responsive |
| Status | Issued |
| Number | ENG 2024 - 005 (Carrollton Heights Street Reconstruction Phase 1) |
| Issue Date & Time | 11/7/2024 07:30:02 AM (CT) |
| Close Date & Time | 11/26/2024 11:00:00 AM (CT) |
| Question Cut Off Date | 11/19/2024 05:00:00 PM (CT) |
| Notes |
The Project Improvement limits are within the Carrollton Heights subdivision in the City of Carrollton. Improvement streets include Clint Street, Baxley Street, Maryland Street, Spring Avenue, Rosemon Avenue, Walnut Street, and associated alleys. The project consists of barricades and traffic control, removal, disposal, and replacement of 25,000 square yards of street pavement, construction of approximately 4,800 SY of sidewalks, 606 CY of retaining walls, 210 LF of sanitary sewer mains, 3,000 LF of water mains, 4690 LF of storm pipe, and residential street lighting.
An optional Pre-bid meeting will be held at City Hall in Conference Room 1W2 at 10:00 a.m. November 12, 2024.
Pre-bid questions are required to be submitted via the IonWave Technologies, Inc. bidding system, and will be excepted until 5:00 p.m., November 19, 2024.
Special Note: Prior to submittal of questions related to the Carrollton Heights Street Reconstruction Project bid, please review all the information and instructions provided in the Contract Documents and Specifications manual.
Should it be necessary, an addendum addressing the questions received will be issued no later than 11:00 AM on November 21, 2024.
|
| Name | Carmella Flemming |
| Address |
1945 E. Jackson Road
Carrollton, TX 75006 USA |
| Phone | (972) 4663204 |
| Fax | |
| carmella.flemming@cityofcarrollton.com |
| Document name | Format | |
|
||
|
Bid Invitation
|
Acrobat / PDF | |
|
Public Question & Answer
|
Acrobat / PDF |
| File Name | Description | File Size |
|
||
| Carrollton Heights Phase 1 - Contract Documents and Specifications.pdf (please login to view this document) | Carrollton Heights Phase 1 Street Reconstruction Contract Documents and Specifications | 3.28 MB |
| Carrollton Heights Phase 1 - Plan Set.pdf (please login to view this document) | Carrollton Heights Phase 1 Street Reconstruction - Plan Set | 51.61 MB |
| Carrollton Heights Street Reconstruction (Carrollton, TX) Geotechnical Report.pdf (please login to view this document) | Carrollton Heights Phase 1 Street Reconstruction Geotechnical Report | 8.40 MB |
| Carrollton Heights Phase 1 - Slope Stabililty Analysis.pdf (please login to view this document) | Carrollton Heights Phase 1 Street Reconstruction - Slope Stability Analysis Report | 2.66 MB |

With GovernmentContracts, you can:
...and installation of garage doors, replacement of lighting, ceiling grids/tiles, personnel doors...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026
...project for work that requires demolition and installation of garage doors, replacement of ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026