| Location: | Washington |
|---|---|
| Posted: | Jul 27, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | AM1308 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of removal of the existing 15kV fused switches and dry type transformers and replacement with new, Owner-furnished 15kV fused switches and oil-filled transformers at Substation A/B located inside the headworks building at the Budd Inlet Treatment Plan (BITP). The engineer's estimate is $1,132,000.00 - $1,446,000.00 including sales tax. A Pre-Bid Meeting will be held at BITP - 500 Adams ST NE, Olympia, WA 98501 on August 04, 2026, at 10:00 A.M. A site visit will follow the meeting. Questions must be emailed to bids@lottcleanwater.org. Messages submitted on this project portal are not monitored. Bid Proposals must be submitted as a PDF document on this project portal. Paper originals of bid guarantees must be received by LOTT in person by the submittal deadline.

With GovernmentContracts, you can:
...Project: SUBSTATION POWER TRANSFORMER Ref. #: M2-2026 Department: Mason County PUD No. #3 ...
Sammamish Plateau Water
Bid Due: 10/21/2026
...PT26-0110F RFP 10/06/2026 11 AM Mayfield Bank 2 GSU Transformer Specification Register for ...
City of Tacoma
Bid Due: 10/06/2026
...fuel shut offs. Identify and repair corrosion beneath the transformers in the aft ...
DEPT OF DEFENSE
Bid Due: 12/04/2026
.... Identify and repair corrosion beneath the transformers in the aft lazzarette, install ...
DEPT OF DEFENSE
Bid Due: 12/04/2026