| Location: | Washington |
|---|---|
| Posted: | Jul 27, 2026 |
| Due: | Aug 27, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BI2205 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project consists of furnishing and installing a chemical storage and feed system including sitework, tanks, metering pumps, enclosure, piping, valves, electrical, instrumentation, and controls. The engineer's estimate is $590,000 - $750,000 including sales tax. A pre-bid meeting will be held at LOTT Clean Water Alliance, 500 Adams Street NE, Olympia, WA 98501 on August 5, 2026 at 10:00am. A site visit will follow the meeting. Details regarding the meeting and site visit are included in Section 00 21 13. Questions must be emailed to bids@lottcleanwater.org. Messages submitted on this project portal are not monitored. Bid Proposals must be submitted as a PDF document on this project portal. Paper originals of bid guarantees must be received by LOTT in person by the submittal deadline.

With GovernmentContracts, you can:
...for the Electrical lighting controls replacement to include: replacing the existing lighting control ...
Pierce County
Bid Due: 11/04/2026
...as well as on tribal land. Commodity Codes 907-28-Communications Systems; TV; Microwave; Telephone...; ...
State Government of Washington
Bid Due: 11/20/2026
...control center lineups. Provide modernized controls for existing electrical loads. Provide one (1... ...
DEPT OF DEFENSE
Bid Due: 11/13/2026
...System Project Reports 5. Hydraulic Analysis 6. Fire Flow Testing 7. Electrical engineering ...
City of Poulsbo
Bid Due: 11/20/2026