Treatment Plant Upgrades for PFAS Reduction in Drinking Water Through CMAR Collaborative Delivery

Location: Georgia
Posted: Jun 29, 2026
Due: Jul 30, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
Solicitation No: PE-76500-NONST-2026-000000023
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-76500-NONST-2026-000000023 Treatment Plant Upgrades for PFAS Reduction in Drinking Water Through CMAR Collaborative Delivery Calhoun, City Of
Jun 29, 2026 @ 05:07 PM
Jul 30, 2026 @ 10:00 AM
Treatment Plant Upgrades for PFAS Reduction in Drinking Water Through CMAR Collaborative Delivery

Start Date: Jun 29, 2026 @ 05:07 PM ET

End Date:
Jul 30, 2026 @ 10:00 AM ET

Event ID: PE-76500-NONST-2026-000000023
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: city
Fiscal Year: 2026
Agency Site: Link


Description


The City of Calhoun is requesting Statement of Qualifications and Proposals from qualified Construction Manager at Risk (CMAR) organizations for upgrades at their 12.8 MGD Brittany Drive WTP (Contract A) and 18 MGD Mauldin Road WTP (Contract B). Integration of micro/ultrafiltration pretreatment and reverse osmosis membranes at the existing facilities will enable the City to comply with PFAS/MCL regulations as mandated by EPA. Proposal documents are available at www.QuestCDN.com. See attachment for more information.

NIGP Codes
Code Description
89020 Demineralizers: Reverse Osmosis, etc.
96896 Water and Wastewater Treatment Services
89087 Water Treatment Equipment (Not Otherwise Classified)
89016 Complete Water Treatment Systems, Nonchemical: Ultraviolet Water Supply Sterilization, etc.
91360 Construction, Water System, Plants, Main and Service Line
BuyerContact:

Andrea Everett
aeverett@calnet-ga.net

7066025682

Attachment Preview

ADVERTISEMENT OF REQUEST FOR QUALIFICATIONS AND PROPOSALS
CITY OF CALHOUN
GORDON COUNTY, GEORGIA
TREATMENT PLANT UPGRADES FOR PFAS REDUCTION IN DRINKING WATER AT
BRITTANY DRIVE (CONTRACT A) & MAULDIN ROAD (CONTRACT B)
THROUGH THE COLLABORATIVE DELIVERY METHOD (CMAR)
General Notice
The City of Calhoun (Owner) will be requesting Statements of Qualifications and Proposals from
Construction Manager at Risk (CMAR) organizations (Proposers) for the construction of the following
Projects, and for related pre-construction and procurement CMAR services:
BRITTANY DRIVE WTP IMPROVEMENTS - CONTRACT A
C&S Project No.: C1075.004
&
MAULDIN ROAD WTP IMPROVEMENTS - CONTRACT B
C&S Project No.: C1075.005
Owner will receive Statements of Qualifications and cost proposals demonstrating the Proposer's
qualifications and ability to provide CMAR services and construct one or both projects at Calhoun Utilities,
700 West Line St., Calhoun, GA 30701, until Thursday, July 30, 2026 at 10:00 a.m. local time. After that
time, Owner will no longer accept Statements of Qualifications and Cost Proposals. See Requests for
Qualifications and Requests for Proposals for details on preparing and submitting the Statement of
Qualifications and Cost Proposals.
The CMAR Contract will include the following services and Work for Contract A:
* Construction of a new 12.8 MGD (hydraulically designed for an ultimate capacity of 18 MGD)
reverse osmosis (RO) treatment facility for PFAS reduction, including:
o MF Membranes
o RO Membranes
o Clean In Place (CIP) Equipment
o Chemical Feed System(s)
o Chemical Storage Area(s)
o Integrated SCADA System with Remote Access Controls
o New Building with:
Overhead Industrial Hoist System
Large Bay Doors
Climate Control w/ Humidity Control
EJCDC(R) CMAR-111, Advertisement of Request for Qualifications-Construction Manager at Risk Series.
Copyright(C) 2023 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 5

Operations Space (w/ Workstations for Operators, SCADA, etc.)
Laboratory Space (w/ Space for Testing Equipment (Owner Provided), Sinks,
Sampling Equipment, etc.)
Maintenance and Storage Areas
Offices
Meeting Room
Break Room
Restroom/Locker Room Facilities
Electrical Room
Mechanical Room
o Backwash Recovery System
o Waste Stream Processing Facility, including Clarification, Thickening, and Dewatering
o New Filters for filtration of all liquid waste streams prior to discharge
o PFAS Removal treatment of waste stream
* Other site and yard piping improvements as necessary for a complete and functional project
including connection to existing facilities and system, paving, grading, drainage, storm water
detention (if required), yard piping, and site lighting.
The CMAR Contract will include the following services and Work for Contract B:
* Construction of a new 18MGD (hydraulically designed for an ultimate capacity of 24MGD) reverse
Osmosis (RO) treatment facility for PFAS reduction, including:
o MF Membranes (Located in New Building)
o RO Membranes (Located in New Building)
o Clean In Place (CIP) Equipment (Located in New Building)
o Chemical Feed System(s) (Located in New Building)
o Integrated SCADA System with Remote Access Controls
o New Building with
Overhead Industrial Hoist System
Large Bay Doors
Climate Control w/ Humidity Control
Operations Space (w/ Workstations for Operators, SCADA, etc.)
Laboratory Space (w/ Space for Testing Equipment (Owner Provided), Sinks,
Sampling Equipment, etc.)
Maintenance and Storage Areas
Offices
Meeting Room
EJCDC(R) CMAR-111, Advertisement of Request for Qualifications-Construction Manager at Risk Series.
Copyright(C) 2023 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 5

Break Room
Restroom/Locker Room Facilities
Electrical Room
Mechanical Room
o Backwash Recovery System
o Waste Stream Processing Facility, including Clarification, Thickening, and Dewatering
o New Filters for filtration of all liquid waste streams prior to discharge
o PFAS Removal treatment of waste stream
o Hydraulic improvement issues within the existing treatment system
o New Clearwell(s)
o New Finished Water Pump Station
* Other site and yard piping improvements as necessary for a complete and functional project
including connection to existing facilities and system, paving, grading, drainage, storm water
detention (if required), yard piping, and site lighting.
The pre-construction and procurement services of the CMAR Contract has an expected start date of
October 2026 and an estimated duration of pre-construction and procurement services of 300 days. The
Notice to Proceed for construction is expected to occur October 2027 with a duration of 920 days. Final
completion of the project is expected to be April 2030.
Obtaining the Proposal Documents
Project Information and Proposal Documents for the CMAR Contract can be found at the following
designated website:
www.QuestCDN.com
Quest Number: 10233316
The Proposal Documents are available to view for free at the designated website. The fee to download
the digital documents is $50.00 payable through the website. An SOQ will not be considered by the Owner
unless the Bidder is on record as having purchased and received complete RFQ/SOQ documents.
All prospective Proposers are required to register with the designated website as an interested party, even
if the Proposer has obtained the Proposal Documents from a source other than the designated website.
Neither Owner, Owner's Advisor, nor Engineer will be responsible for Proposal Documents, including
addenda, if any, obtained from sources other than QuestCDN.com.
Information Conference
An Information Conference regarding the CMAR Contract and CMAR selection process will be held on
Thursday, July 9, 2026 at 9:00 a.m. at Calhoun Utilities, 700 West Line St., Calhoun, GA 30701. Attendance
at the Information Conference is mandatory.
Two-Step Process
EJCDC(R) CMAR-111, Advertisement of Request for Qualifications-Construction Manager at Risk Series.
Copyright(C) 2023 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 5

Criterion Description Point Value
1 All addenda downloaded and acknowledged Satisfactory/Unsatisfactory
2 Submission follows format & content requirements Satisfactory/Unsatisfactory
3 Provides information on at least 5 similar projects completed by Proposer's team Satisfactory/Unsatisfactory
4 Utility Contractor License Satisfactory/Unsatisfactory
5 Debarment Status Satisfactory/Unsatisfactory

Selection of the Construction Manager at Risk (CMAR) will be made using a two-step process.
Step One: The Owner will receive Statements of Qualifications and Cost Proposals from interested
Proposers. The Owner may decide to hold virtual interviews with all Proposers to clarify any potential
questions regarding information provided in the SOQs. Please hold July 31, 2026 in your calendars for
virtual interviews. Time slots for interviews will be sent out after the pre-bid information conference. The
SOQs and Cost Proposals will be evaluated independently and scored based on established criteria.
Proposers shall submit one (1) SOQ addressing the Proposer's overall qualifications for delivery of the
Project(s). The Owner intends to evaluate qualifications through a single SOQ submission applicable to
both projects.
Proposers shall submit cost proposals for:
a. Contract A only,
b. Contract B only, and/or
c. Contract A and Contract B combined.
Submission of proposals for Contract A and Contract B only, without submission of a combined Contract
A + Contract B proposal, will be interpreted by the Owner as the Proposer not seeking consideration for
award of both projects to a single CMAR contract. The Owner reserves the right to award Contract A and
Contract B separately to different Proposers, award both projects to a single Proposer, reject any or all
proposals, or make such award(s) as determined to be in the Owner's best interest.
The combined scores will be used to develop a list of qualified, responsive Proposers. These shortlisted
Proposers will be invited to participate in Step Two interviews.
Step Two: The shortlisted Proposers will be invited to participate in an interview, which will also be scored.
The scores from Step One and Step Two will be combined to determine the final ranking of Proposers for
award of the CMAR Contract.
Under the two-step process the selection of the Construction Manager at Risk will be made using the
following selection criteria and scoring:
Satisfactory/Unsatisfactory Criteria:
Criterion Description Point Value
1 All addenda downloaded and acknowledged Satisfactory/Unsatisfactory
2 Submission follows format & content requirements Satisfactory/Unsatisfactory
Provides information on at least 5 similar projects completed
3 Satisfactory/Unsatisfactory
by Proposer's team
4 Utility Contractor License Satisfactory/Unsatisfactory
5 Debarment Status Satisfactory/Unsatisfactory
EJCDC(R) CMAR-111, Advertisement of Request for Qualifications-Construction Manager at Risk Series.
Copyright(C) 2023 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 5

Criterion Description Weighting Value (Points)
A Experience and Past Performance of Proposer on CMAR Projects 10
B Experience and Past Performance of Proposer on Water/Wastewater & References 25
C Experience and Qualifications of Proposed Key Personnel 15
D Local Participation 5
E Financial Capacity & Current Project Commitments 20
F CMAR Preconstruction and Procurement Services 3
G CMAR Construction Services 22
Subtotal Points 100
H Proposer's Approach to the Project/Construction Schedule/Interview 20
Total Points 120

Weighted Criteria:
Weighting
Criterion Description
Value (Points)
A Experience and Past Performance of Proposer on CMAR Projects 10
Experience and Past Performance of Proposer on Water/Wastewater &
B 25
References
C Experience and Qualifications of Proposed Key Personnel 15
D Local Participation 5
E Financial Capacity & Current Project Commitments 20
F CMAR Preconstruction and Procurement Services 3
G CMAR Construction Services 22
Subtotal Points 100
H Proposer's Approach to the Project/Construction Schedule/Interview 20
Total Points 120
Proposal Documents
Details regarding the selection criteria and the selection process are included in the Request for
Qualifications (CMAR-200) and the Request for Proposals (CMAR-400). Refer to the Proposal Documents
for all further requirements regarding Statements of Qualifications, Proposals, CMAR selection, and other
Proposal submittals, qualifications, and procedures. Please contact Greg Ashworth, P.E., Carter & Sloope,
Inc. (gashworth@cartersloope.com) or Chrissy Garrison, Carter & Sloope, Inc.
(cgarrison@cartersloope.com) with questions related to proposal documents and project scope.
This Advertisement is issued by:
Owner: City of Calhoun
By: Mr. Erik Henson
Title: Water and Wastewater Director
EJCDC(R) CMAR-111, Advertisement of Request for Qualifications-Construction Manager at Risk Series.
Copyright(C) 2023 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 5 of 5

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid # Bid/Proposal Name Pre-Bid/Pre-Proposal Bid/Proposal Opening Bid Tabulation ITB 27-006 Speed Table ...

City of Albany

Bid Due: 8/17/2026

...Natural Gas Pipeline Construction (PDF, 7MB) 08/18 09/16/2026...

City of Albany

Bid Due: 9/16/2026

...RFQ for Engineering and Construction Services Development Authority Of Dawson County Aug 07, ...

State Government of Georgia

Bid Due: 9/07/2026

...26-181 Construction Svcs for May Park Improvements Available Date: 7/23/2026 Due Date: 8/18/2026... ...

https://www.augustaga.gov/

Bid Due: 8/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.