| Location: | Texas |
|---|---|
| Posted: | Oct 13, 2024 |
| Due: | Oct 31, 2024 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24-0278 |
| Publication URL: | To access bid details, please log in. |
Project Description: Proposed improvements are to include realigning 800 LF of the West Fork Trinity River to a stable planform. The stabilization would include realignment of the channel thalweg using a riffle, pool, riffle sequence and providing a stable meander radius of 400’. A bankfull bench would be graded throughout the project. Rock will be placed along the riffles, and a rock toe will be added in the pool along the outside of the meander to protect from lateral migration. Pool grading will also be included. The left and right bank would be laid back to a stable 3:1 or shallower slope. The site will be stabilized by providing an extensive vegetation plan which includes biodegradable erosion control and various sizes and species of native trees, shrubs, live stakes and seeding.

With GovernmentContracts, you can:
RFP FOR THE COLLECTION OF FEES OWED FOR THE DRIVERS RESPONSIBILTY PROGRAM Agency:
State Government of Texas
Bid Due: 6/22/2040
BIRMINHAM HEAVY DUTY SHEAR #CPTH-0865 OR EQUAL. Agency: TEXAS DEPARTMENT OF TRANSPORTATION Open
State Government of Texas
Bid Due: 11/22/2042
RFP/RFCSP # Description Opening, Date and Time Buyer 14-056 On Line Auction www.lonestarauctioneers.com
Fort Worth Independent School District
Bid Due: 11/15/2029
Title Start Date End Date RFP #8711 - Precision Metal Equipment Equipment for
Lubbock Independent School District
Bid Due: 7/16/2068