| Location: | Virginia |
|---|---|
| Posted: | Aug 21, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z02726RFQ000053 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 0002: The purpose of this amendment is to update the statement of work to include the requirement to remove and replace the baseboards and to upload the floor plans for worksite.
Amendment 0001: The purpose of this amendment is to update block 1 and 3 of the SF18 and remove the number 10 from “five (10) days” typo on the Statement of Work paragraph IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES.
The Contractor shall provide all labor, materials, tools, safety equipment, supervision, and specialized machinery necessary to complete the concrete grinding, repair, and polishing process for the estimated 3,000 SF area. See attached Statement of Work. It is anticipated that this procurement is 100% set-aside for Small Businesses using NAICS code of 561790 Other Services to Buildings and Dwellings and a small business size standard of $9.0 million. The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation. See FAR 52.212-1 for submission instructions & FAR 52.212-2 for evaluation criteria. All quotes must be submitted by 5:00PM Eastern Time on 08/26/2026 via email to Jamie.C.Bridges@uscg.mil. Quotes shall be submitted via the SF-18. Questions about this solicitation must be submitted in writing to the Contracting Officer and Contract Specialist at the email addresses listed above no oral questions will be accepted. Questions must be submitted no later than 12:00PM EST on 08/20/26.
All potential quoters are strongly encouraged to visit the site to field verify any/all quantities before submitting quotes. A site visit will be held on 08/19/26 at 10:00AM Eastern Time. Interested parties must arrange site visits with Jamie Bridges at Jamie.C.Bridges@uscg.mil and Christopher Dollahon at Christopher.P.Dollahon@uscg.mil. Full name, date of birth, and REALID Driver's License number must be provided.
| Aug 12, 2026 | [Solicitation (Updated)] Base Portsmouth Wheelhouse Flooring |
| Aug 24, 2026 | [Solicitation (Updated)] Base Portsmouth Wheelhouse Flooring |

With GovernmentContracts, you can:
...Project ID: 11323-0-2027MD Title: Concrete expansion joint replacement Addenda: 0 Release Date: 9.../10/2026 ...
City of Norfolk
Bid Due: 9/30/2026
...Concrete Wash Bay Replacement Status: Open IFB 127112-2 New River Resource Authority -On ...
State Government of Virginia
Bid Due: 9/21/2026
...RFQ Prequalification of Concrete, Mechanical Elect... Status: Open RFPQ 127706 Christopher Newport...: 10/15/26 ...
State Government of Virginia
Bid Due: 10/15/2026
...Sealing Services for Brick, Masonry, or Concrete Status: Open IFB 126633 City of ...
State Government of Virginia
Bid Due: 9/22/2026