| Location: | South Carolina |
|---|---|
| Posted: | Aug 21, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA441826Q0082 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The 628th Civil Engineer Squadron (CES) requires a new Facility-Related Control System (FRCS) for generator monitoring. The current system is non-existent and needs to be a modern, secure, on-premise solution that meets all current Air Force cybersecurity standards. The primary objective of this project is to procure and install a new, on-premise generator monitoring system and replace the associated network hardware to ensure continuous, secure, and reliable operational oversight.
All Questions are due no later than 2 pm EST 26 August 2026.
Please read and follow any instructions contained in clause 52.212-1. Also, be mindful of evaluation criteria under clause 52.212-2.
NOTE: Offeror is required to submit a priced Comprehensive Bill of Materials (BOM) that identifies all equipment, components, parts and materials required to complete the installation and meet the requirements. Furthermore, the BOM shall include item descriptions, quantities, unit prices, manufacturer names and model numbers (as applicable). The information provided must be sufficient to verify technical compliance and evaluate the completeness of the proposed solution.
| Aug 31, 2026 | [Solicitation (Updated)] Charleston Generator Monitoring System |

With GovernmentContracts, you can:
...will be installed. Installation of a new electrical system, controls, and an on-site ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/25/2026
...control system. Documents May Be Obtained From: lford@SSOE.com Project Details: https://scbo.sc.gov... campus building ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/17/2026
...control is not working to reduce the high humidity inside the building. A ...
DEPT OF DEFENSE
Bid Due: 4/01/2029
...electrical equipment needed to support the new HVAC system, as well as providing ...
DEPT OF DEFENSE
Bid Due: 4/01/2029