| Location: | Kentucky |
|---|---|
| Posted: | Jan 6, 2026 |
| Due: | Jan 20, 2026 |
| Agency: | State Government of Kentucky |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-785-2600000253-2 |
| Publication URL: | To access bid details, please log in. |
Description: RFB-147-26 DJJ-Lake Cumberland YDC Paving and Retaining Wall
Department: Facilities & Support Services
Buyer: Janis Wilhoite
Solicitation Number: RFB-785-2600000253-2
Type: Request for Bids (RFB)
Category: Construction
Closing Date and Time: 01/20/2026 01:30 PM EST
| Line Number | Commodity Description | Details | Requested | |
|
1
|
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.***
Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded**
The project includes asphalt paving, both mill and replace and full depth replacement. The site plan provide locations for which type of paving is needed. There is limited concrete paving for the dumpster on the north end of the site.
There is a gabion retaining wall that is to be replaced with a mechanically stabilized earth block wall. A plan and profile of the new retaining wall is included in the construction drawings. The drawings indicate a lane of travel to remain open around the wall excavation/backfill area for access to the north end of he Camp at all time. When replacing the gabion wall a sanitary sewer lateral will need to be removed and reinstalled as well as rerouting of storm sewers around the new retaining wall.
There is one sanitary manhole to be replaced in the drive aisle near the north end of the site as well.
|
Specifications
Commodity Code
912
|
Service From
01/16/2026
Service To
08/14/2026
|
View Purchase History
Additional Information
|

With GovernmentContracts, you can: