| Location: | Georgia |
|---|---|
| Posted: | Apr 15, 2026 |
| Due: | May 15, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-63560-NONST-2026-000000020 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-63560-NONST-2026-000000020 | WPCP Modifications | Moultrie, City Of |
Apr 15, 2026 @ 08:58 AM
|
May 15, 2026 @ 10:00 AM
|
Start Date: Apr 15, 2026 @ 08:58 AM ET
End Date:
May 15, 2026 @ 10:00 AM ET
¿Sealed bids for construction of the WPCP Modifications (2021 CWSRF) will be received until May 15, 2026 at 10:00 AM local time. Bids must be submitted electronically through QuestCDN.com No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website no later than 30 minutes after the closing time. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law.
The work shall include, but not be limited to, aerated grit system replacement, primary clarifier abandonment, clarifier bypass line and flume channel installation, pump station bypass piping and pad installation for portable pump use, skid-mounted WAS pump and piping installation at RAS/WAS pump station, pump, wetwell top and pipe replacement at facility pump station, air compressor system replacement with associated pipe and HVAC modifications, miscellaneous plant-wide equipment component furnishing and replacement, and associated electrical and SCADA improvements. Work also includes demolition, mobilization/demobilization, bonds, insurance, delivery of materials, taxes, and all other appurtenances necessary for completion of the Work. Time allotted for completion of work is 360 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.¿
| Code | Description |
| 89065 | Sewage and Waste Treating Equipment and Supplies |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
| 91356 | Construction, Utility and Underground Projects |
Gail Brinson
gail.brinson@moultriega.com
229-890-5425

With GovernmentContracts, you can:
...Qualifications for Engineering Services for Sewer Project NIGP Codes Code Description 92587 Sewage... ...
State Government of Georgia
Bid Due: 7/06/2026
...there. NIGP Codes Code Description 89095 Recycled Water Supply, Groundwater and Sewage Treatment ...
State Government of Georgia
Bid Due: 6/18/2026
...and Repair 93691 Water Supply and Sewage Treatment Equipment Maintenance and Repair 94173 ...
State Government of Georgia
Bid Due: 7/31/2026
...Sewage Collection, Treatment, and Disposal Engineering 92596 Waste Water Treatment Engineering 92597... may ...
State Government of Georgia
Bid Due: 7/16/2026