| Location: | Connecticut |
|---|---|
| Posted: | Jan 6, 2026 |
| Due: | Feb 11, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-36 |
| Publication URL: | To access bid details, please log in. |
The project consists of the construction of a new total trihalomethane (TTHM) removal system and appurtenant work for the existing Richard Brown Water Storage tank which is a 0.275 MG welded steel tank approximately 82 feet in height with a diameter of approximately 24 feet located in Montville, Connecticut. Additional work will include the replacement of the cathodic protection system components, a new combination free chlorine/pH analyzer and above-grade cabinet, a new above-grade 12-foot x 10-foot structure, a new 30 KW diesel driven standby generator and related site work.
Robert Castronova 100 Broadway Room 105 Norwich CT, 06360 United States Tel: 860-823-3770 Fax: rcastronova@cityofnorwich.org

With GovernmentContracts, you can:
...Number 8665 Title Trumpet Brook Sewer Relocation Available Date 7/9/2026 4:30 PM Clarification..., ...
City of Waterbury
Bid Due: 8/06/2026
...Sanitary Sewer Evaluation Study The City of Bristol Water and Sewer Department is ...
State Government of Connecticut
Bid Due: 8/07/2026
...Bid Title: Sewer-Storm Manhole Covers, Frames and Risers RFP Category: Town of Enfield, ...
Town of Enfield
Bid Due: 8/11/2026
...Bid/Rfp Number Description Due By Bid 27-181T Sewer Pump Station 10 Force Main ...
Town of Westport
Bid Due: 8/13/2026