| Location: | Pennsylvania |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Feb 17, 2026 |
| Agency: | Pennsylvania State University |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 00-10339.00 |
| Publication URL: | To access bid details, please log in. |
The project includes replacing existing EPDM roof systems with new 30-year PVC (KEE) roofs and new aluminum gutters and downspouts at Grubb and Garban Halls, upgrading mechanical systems by replacing gas-fired furnaces with new indoor and outdoor HVAC units and associated piping and ductwork, replacing roof drains, and providing electrical power to the new HVAC equipment.
As an Alternate, bidders shall include cost to install fall protection for the roofs specified in the construction documents.
Bids will be received electronically only through the Trimble Unity Construct Bid Portal. Bids will not be accepted in any other format.
| Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
| 001 | Roofing Construction | 02/09/2026 - 01:00 pm | Recommended but not Mandatory | 02/17/2026 - 03:00 pm |

With GovernmentContracts, you can:
...and adding fall protection to the Science & Technology Bldg at Penn State ...
Pennsylvania State University
Bid Due: 6/24/2026
...15236 USA Description Overview: Respiratory protection research and panel sizing requirements.../head size fall ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 6/12/2026
...Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical... ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
...Requirements Description: The Pennsylvania Department of Environmental Protection (Department), Bureau... or emichel@pa.gov. Department ...
State Government of Pennsylvania
Bid Due: 6/12/2026