| Location: | South Carolina |
|---|---|
| Posted: | Aug 19, 2026 |
| Due: | Sep 22, 2026 |
| Agency: | Aiken County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27-01-B |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
27-01-B
|
| Bid Title: |
New Hope Lateral Sewer Pipe Improvements
|
| Category: | Request for Sealed Bids |
| Status: | Open |
| Additional Status Information: | Until Awarded |
|
THIS PAGE INTENTIONALLY LEFT BLANK
| SCHEDULE OF DRAWINGS | |
|---|---|
| Drawing Number | Description |
| G0.00 | Cover Sheet |
| G0.01 | General Notes and Legend |
| C1.01 | Rehab Plan and Schedule |
| CD1.01 | Civil Details |
ARDURRA
SECTION 01 10 10
SCHEDULE OF DRAWINGS
PART 1 - GENERAL
1. 1 DRAWINGS ACCOMPANYING SPECIFICATIONS
A. The following Drawings, prepared by Ardurra Group, Inc. and dated August 2026,
accompany this Specification and are a part of the Contract Documents. Drawings are the
property of the Owner and shall not be used for any purpose other than as intended by the
Contract Documents.
B. SCHEDULE OF DRAWINGS
SCHEDULE OF DRAWINGS
Drawing Number Description
G0.00 Cover Sheet
G0.01 General Notes and Legend
C1.01 Rehab Plan and Schedule
CD1.01 Civil Details
PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION
Not Used.
END OF SECTION
Aiken County Schedule of Drawings
New Hope Lateral Sewer Improvements 01 10 10 - 1
THIS PAGE INTENTIONALLY LEFT BLANK
ARDURRA
SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Project Identification: New Hope Lateral Sewer Improvements
B. Project Location: Aiken, South Carolina
C. Owner: Aiken County
70 PSA Road
Beech Island, SC 29842
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. The Project consists of furnishing all labor, materials, equipment and incidentals required to
complete work in its entirety as shown on the Drawings and specified herein.
B. Perform work complete, in place, and ready for continuous service. Work includes permits,
testing, cleanup, repairs, replacements and restoration required as a result of damages
caused during construction.
C. Comply with all applicable municipal, county, state, federal, and other codes.
D. Work includes, but is not necessarily limited to the following:
1. Installation of approximately 368 linear feet of HDPE sanitary sewer pipe via pipe
bursting, including all necessary modifications and connections to existing manholes to
complete the work.
2. Removal and replacement of approximately one (1) precast concrete manhole using
conventional open-cut methods.
3. Implementation of bypass pumping, as required, to maintain continuous service within
the active sanitary sewer conveyance system.
4. Restoration of all disturbed surfaces and application of erosion prevention and sediment
control measures.
1.3 CONTRACT
A. Project will be constructed under a general construction contract.
Aiken County Summary of Work
New Hope Lateral Sewer Improvements 01 11 00 - 1
ARDURRA
PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION
Not Used.
END OF SECTION
Aiken County Summary of Work
New Hope Lateral Sewer Improvements 01 11 00 - 2
ARDURRA
SECTION 01 12 16
WORK SEQUENCE
PART 1 - GENERAL
1.1 SUMMARY
A. Perform work in an orderly manner to cause the least disruption to Owner's activities and the
operation of the existing sanitary sewer collection systems.
B. Where necessary to prevent or minimize interruptions of existing collection system
operations, schedule work for system tie-ins or flow transfers during low demand periods.
C. No time extension or increased cost claims will be considered for overtime work as a result
of completing work in accordance with the requirements established herein.
1.2 SUBMITTALS
A. Submit to Engineer overall plan of construction.
1.3 PROJECT SITE CONDITIONS
A. All access onto the existing site must be coordinated with Engineer and Owner prior to
access. All access points must be secured and remain secured throughout the construction
period.
1.4 SEQUENCING AND SCHEDULING
A. The existing facilities comprise a fully functioning gravity sewer system. Conduct all work in
a manner which will not interrupt or jeopardize system operations or cause permit violations.
B. Coordinate all required bypassing with Owner and provide a minimum of 72 hours prior
notice.
C. Sequencing:
1. Clean and perform CCTV inspection of the project area.
2. Install erosion and sediment control Best Management Practices (BMPs) prior to any
land-disturbing activities.
3. Complete rehabilitation work as indicated in the contract drawings, while conducting
bypass operations concurrently in the most practical manner.
4. Perform required testing and final cleanup.
5. Place the system into service.
6. Restore all disturbed surfaces to a condition equal to or better than preconstruction.
Aiken County Work Sequence
New Hope Lateral Sewer Improvements 01 12 16 - 1
ARDURRA
PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION
Not Used.
END OF SECTION
Aiken County Work Sequence
New Hope Lateral Sewer Improvements 01 12 16 - 2

With GovernmentContracts, you can:
...and its location within FEMA Zone AE, the TCA will use a deep ...
DEPT OF DEFENSE
Bid Due: 10/13/2026
...soil quality and its location within FEMA Zone AE, the TCA will use ...
DEPT OF DEFENSE
Bid Due: 10/13/2026