WASTEWATER TREATMENT PLANT BOILER REPLACEMENT?PROJECT - PROJECT NO. 26-01

Location: California
Posted: Mar 25, 2026
Due: Apr 21, 2026
Agency: City of Grass Valley
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.

WASTEWATER TREATMENT PLANT BOILER REPLACEMENTA?PROJECT -
PROJECT NO. 26-01

Bids will be received at the City of Grass Valley, Engineering Division, 125 East Main Street, Grass Valley, CA 95945 until 3:30 P.M. on APRIL 21, 2026, at which time they will be publicly opened and read aloud at said address. Any protest regarding the award of the contract must be submitted pursuant to the instructions stated in the special provisions.

GENERAL WORK DESCRIPTION: The scope of work, in general, includes; purchase of a new sludge heater/boiler, removal of the existing equipment, and installation of the new equipment. Other related items not mentioned above, that are required by the plans, specifications or these Special Provisions shall be performed, placed, constructed, or installed. Project Location: Grass Valley Sewer Treatment Plant, 556 Freeman Lane, in Grass Valley, California The Engineer's estimate for this project is $500,000.00 The time of completion shall consist of 10 Working Days

Notice to Contractors, Special Provision, Construction Contract and Project Plans

Proposal and Bidder's Certificates

Attachment Preview

CITY OF GRASS VALLEY
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
NOTICE TO CONTRACTORS,
SPECIAL PROVISIONS, AND
CONSTRUCTION CONTRACT
FOR
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT
PROJECT
PROJECT NO. 26-01

WASTEWATER TREATMENT PLANT BOILER REPLACEMENT
PROJECT
PROJECT NO. 26-01
~'
Date
City Engineer

CITY OF GRASS VALLEY
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
NOTICE TO CONTRACTORS
Sealed proposals for the work shown on the plans entitled:
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT
PROJECT NO. 26-01
Bids will be received at the City of Grass Valley, Engineering Division, 125 East Main Street, Grass Valley, CA
95945 until 3:30 P.M. on APRIL 21, 2026, at which time they will be publicly opened and read aloud at said
address. Any protest regarding the award of the contract must be submitted pursuant to the instructions stated in
the special provisions.
GENERAL WORK DESCRIPTION:
The scope of work, in general, includes; purchase of a new sludge heater/boiler, removal of the existing
equipment, and installation of the new equipment. Other related items not mentioned above, that are required by
the plans, specifications or these Special Provisions shall be performed, placed, constructed, or installed.
Project Location: Grass Valley Sewer Treatment Plant, 556 Freeman Lane, in Grass Valley, California
The Engineer's estimate for this project is $500,000.00
The time of completion shall consist of 10 Working Days
BID INFORMATION:
Bids are required for the entire work described herein. The City of Grass Valley reserves the right to postpone the
date and time for the opening of proposals at any time prior to the date and time announced in the advertisement
in accordance with applicable law.
No pre-bid meeting is scheduled for this project.
The City of Grass Valley reserves the right to reject any and all bids or to waive any minor defects or irregularity
in bidding in accordance with applicable law. In accordance with California Public Contract Code Section
20103.8, if the City elects to award a contract for performance of the project, the contract will be awarded in
accordance with California Public Contract Code Section 20162 and other applicable law to the responsible
bidder submitting a responsive bid with the lowest total bid price for the base bid without consideration of the bid
price for any additive or deductive items. All bids will remain valid for 90 days after the bid opening. Except as
permitted by law and subject to all applicable remedies, including forfeiture of bidder's security, bidders may not
withdraw their bid during the 90 day period after the bid opening.
This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government
Code, Section 12990.
Attention is directed to the requirements specified in Section 3-1.06, "Contractor License", of the Standard
Specifications. The Contractor shall possess a valid California Class "A" Contractor's License, or a combination
of the following classes: C10 - Electrical Contractorand C36 - Plumbing Contractor, and all other classes required
by the categories and types of work included in the contract at the time of the bid award. All licenses shall remain
in effect throughout the term of the contract.
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Notice to Contractors-Page 1 of 3

Plans, specifications and proposal forms for bidding this project can be obtained via download of an electronic
copy of the bid set free of charge from the City's website at
http://www.cityofgrassvalley.com/departments/engineering/rfpsrfqs-and-current-bids.
The City reserves the right, during the bid process and prior to the deadline for submitting bids, to issue one or
more addenda, clarifications, or other communication concerning the bid process, including possible changes as to
the time, place, and manner for submitting bids. The City will provide this information to any potential bidder
who has obtained a bid package directly from the City. The City will also provide notice of the availability of
revisions/addenda to any potential bidder who has obtained a bid package electronically from a contractor bid
room or other source, if that bidder has provided a request for revisions, including the bidder's name, company,
mailing address, phone number, email or fax number and the project name that the bidder is requesting
notifications for. The request for revisions shall be submitted as soon as possible, but no later than five (5)
business days prior to the date specified for opening bids in the manner described below:
* Faxes: To the attention of the Project Manager, Catharine Dykes, at (530) 274-4399.
* Emailed: To the attention of the Project Manager, Catharine Dykes at: catharined@grassvalleyca.gov
* Mailed: To the attention of the Project Manager, Catharine Dykes, City of Grass Valley, Engineering
Division, 125 East Main Street, Grass Valley, CA 95945
Bidders who do not purchase bid documents directly from the City of Grass Valley, but who have requested to
receive revisions as described above, shall only receive email and/or fax notices of the availability of
revisions/addenda. It shall be the bidder's responsibility to access the actual revisions/addenda as electronic
copies from the City's website.
The City will also endeavor to provide such revisions/addenda to any contractor bid room which has requested
copies of the bid documents. The City takes no responsibility for notifying a bidder who does not obtain bid
documents from the City or does not provide the specified request for revisions to the City. Such bidder may be
found non-responsive if that bidder fails to acknowledge, as set forth herein, any addenda or does not take into
account any additional information provided by the City.
All questions concerning this project shall be provided in writing as soon as reasonably possible, but no later than
five (5) working days before the date specified for opening bids. Questions received less than five (5) working
days before the date specified for opening bids may not be answered. All questions must be received by the City,
in the manner described below.
* Faxes: To the attention of the Project Manager, at (530) 274-4399.
* Emailed: To the attention of the Project Manager at: catharined@grassvalleyca.gov
* Mailed: To the attention of the Project Manager, City of Grass Valley, Engineering Division, 125 East
Main Street, Grass Valley, CA 95945
Bidders are responsible to confirm receipt of written questions by the Engineering Division. Additionally, the
City will answer a bidder's question only if the bidder provides the City a means for a response, including a
telephone number, address, and fax number.
The City of Grass Valley hereby notifies all bidders that it will affirmatively ensure that in any contract entered
into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit
bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national
origin in consideration for an award.
Pursuant to Section 1773 of the Labor Code, the general prevailing rate of wages for Nevada County have been
determined by the Director of the California Department of Industrial Relations (DIR). These wages are set forth
in the General Prevailing Wage Rates for this project, may be examined at the office of the Engineering Division,
City of Grass Valley and are available from the California Department of Industrial Relations' Internet web site at
http://www.dir.ca.gov/DLSR/PWD. The Labor Surcharge and Equipment Rental Rates in effect on the date the
work is accomplished will apply to work done under this Contract.
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Notice to Contractors-Page 2 of 3

A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the
requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for
public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant
to Labor Code Section 1725.5 . It is not a violation of this section for an unregistered contractor to submit a bid
that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the
Public Contract Code, provided the contractor is registered to perform public work pursuant to Labor Code
Section 1725.5 at the time the contract is awarded.
Dated: March 25, 2026
BJORN P. JONES
CITY ENGINEER
CITY OF GRASS VALLEY
ENGINEERING DIVISION
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Notice to Contractors-Page 3 of 3

TABLE OF CONTENTS
Page Number
INSTRUCTIONS TO BIDDERS ...................................................................................................................................... 1
SECTION 1 GENERAL SPECIFICATIONS AND PLANS ........................................................................................... 7
1-1.01 GENERAL ........................................................................................................................................... 7
1-1.02 REVISED STANDARD SPECIFICATIONS AND STANDARD PLANS ..................................... 7
1-1.03 DEFINITIONS AND TERMS ............................................................................................................ 7
SECTION 2 BIDDING ....................................................................................................................................................... 8
2-1.01 GENERAL ........................................................................................................................................... 8
2-1.02 REQUIRED LISTING OF PROPOSED PRODUCTS "OR EQUALS" ........................................ 9
2-1.03 SUBCONTRACTOR LIST ................................................................................................................. 9
2-1.04 BIDDER'S SECURITY....................................................................................................................... 9
2-1.05 NON-COLLUSION AFFIDAVIT ...................................................................................................... 9
SECTION 3 CONTRACT AWARD AND EXECUTION ............................................................................................... 9
3-1.01 GENERAL ........................................................................................................................................... 9
3-1.02 AWARD OF CONTRACT ............................................................................................................... 10
3-1.03 CONTRACT BONDS ........................................................................................................................ 10
SECTION 4 BEGINNING OF WORK, TIME OF COMPLETION, AND LIQUIDATED DAMAGES ................. 10
4-1.01 GENERAL ......................................................................................................................................... 10
4-1.02 HOLIDAYS ........................................................................................................................................ 11
4-1.03 PRE-CONSTRUCTION CONFERENCE ....................................................................................... 11
4-1.04 ARCHAEOLOGICAL FINDS ......................................................................................................... 11
4-1.05 EXTRA WORK ................................................................................................................................. 11
4-1.06 SCOPE OF WORK ........................................................................................................................... 11
4-1.07 ELIMINATION OF ITEMS OF WORK ........................................................................................ 11
SECTION 5 GENERAL ................................................................................................................................................... 11
SECTION 5-1 MISCELLANEOUS .......................................................................................................................... 11
5-1.01 LABOR NONDISCRIMINATION .................................................................................................. 11
5-1.02 LABOR CODE REQUIREMENTS ................................................................................................. 12
5-1.03 PREVAILING WAGE ...................................................................................................................... 12
5-1.04 SUBCONTRACTING ....................................................................................................................... 12
5-1.05 PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS .................................................. 12
5-1.06 PROMPT PAYMENT OF WITHHELD FUNDS TO SUBCONTRACTORS ............................ 13
5-1.07 PAYMENTS ....................................................................................................................................... 13
5-1.08 INTEREST ON PAYMENTS ........................................................................................................... 13
5-1.09 WITHHOLDS .................................................................................................................................... 13
5-1.10 PLANS AND WORKING DRAWINGS .......................................................................................... 13
5-1.11 EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK ..... 13
5-1.12 VALUE ENGINEERING ................................................................................................................. 13
5-1.13 RESPONSIBILITY TO OTHER ENTITIES ................................................................................. 14
5-1.14 AREAS FOR CONTRACTOR'S USE............................................................................................. 14
5-1.15 SOUND CONTROL REQUIREMENTS ........................................................................................ 14
5-1.16 PROJECT APPEARANCE .............................................................................................................. 14
5-1.17 RECORDS .......................................................................................................................................... 15
5-1.18 CONTRACTOR'S LICENSING LAWS ......................................................................................... 15
5-1.19 ARBITRATION ................................................................................................................................. 15
5-1.20 NOTICE OF POTENTIAL CLAIM ................................................................................................ 17
5-1.21 FINAL PAYMENT AND CLAIMS ................................................................................................. 17
5-1.22 SURFACE MINING AND RECLAMATION ACT ....................................................................... 17
5-1.23 REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES ............................................. 17
5-1.24 EXCAVATION SAFETY PLANS ................................................................................................... 18
5-1.25 AIR POLLUTION CONTROL ........................................................................................................ 18
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Table of Contents - Page 1 of 2

5-1.26 PERMITS ........................................................................................................................................... 18
5-1.27 INSURANCE ..................................................................................................................................... 18
5-1.27.1 WORKER'S COMPENSATION AND EMPLOYERS LIABILITY INSURANCE......... 18
5-1.27.2 GENERAL LIABILITY INSURANCE ................................................................................ 19
5-1.27.3 CONFORMITY OF COVERAGES ...................................................................................... 19
5-1.27.4 ADDITIONAL REQUIREMENTS ....................................................................................... 19
5-1.27.5 ENDORSEMENTS ................................................................................................................. 20
5-1.27.6 AUTOMOBILE LIABILITY INSURANCE ........................................................................ 20
5-1.28 WARRANTY ..................................................................................................................................... 20
SECTION 6 (BLANK) ...................................................................................................................................................... 20
SECTION 7 (BLANK) ...................................................................................................................................................... 20
SECTION 8 (BLANK) ...................................................................................................................................................... 20
SECTION 9 (BLANK) ...................................................................................................................................................... 20
SECTION 10 CONSTRUCTION DETAILS .......................................................................................................... 20
SECTION 10-1 GENERAL ......................................................................................................................................... 20
10-1.01 SCOPE OF WORK ........................................................................................................................... 21
10-1.02 REQUEST FOR INFORMATION .................................................................................................. 21
10-1.03 WATER POLLUTION CONTROL ................................................................................................ 21
10-1.03.1 GENERAL ................................................................................................................................ 21
10-1.03.2 WATER POLLUTION CONTROL IMPLEMENTATION ..................................................... 22
10-1.03.3 PAYMENT ............................................................................................................................... 22
10-1.03.4 CONSTRUCTION SITE MANAGEMENT ............................................................................. 22
10-1.04 PROPERTY AND FACILITY PRESERVATION ......................................................................... 29
10-1.05 COOPERATION ............................................................................................................................... 29
10-1.06 OBSTRUCTIONS ............................................................................................................................. 30
10-1.07 MOBILIZATION ............................................................................... Error! Bookmark not defined.
CONSTRUCTION CONTRACT..........................................................................................APPENDIX A
PROJECT PLANS & EQUIPMENT SPECIFICATIONS............................................................APPENDIX B
PROPOSAL AND BIDDER'S CERTIFICATE.................................................... SEPARATE ATTACHMENT
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Table of Contents - Page 2 of 2

CITY OF GRASS VALLEY
ENGINEERING DIVISION
SPECIAL PROVISIONS
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT
PROJECT NO. 25-01
INSTRUCTIONS TO BIDDERS
1. BIDDER'S REPRESENTATIONS
Each bidder by submitting a bid represents that:
1.1. The bidder has read and understands the bid package and the bid is in accordance with all of the requirements of
the bid package and applicable law.
1.2. Neither the bidder nor any subcontractor included on the list of proposed subcontractors submitted with the bid are
ineligible to perform work on public works projects pursuant to California Labor Code Sections 1777.1 or 1777.7.
1.3. The bidder understands that quantities of unit price items may vary from the estimates provided in the Special
Provisions, proposal, technical specifications, and construction contract.
1.4. Representatives of the bidder have visited the Project site and have familiarized themselves with the conditions
under which the Project work is to be performed to ensure that the Project work may be performed for the amount
bid.
1.5. The bidder has informed the City in writing no later than five (5) working days prior to the time specified for bid
opening of any apparent conflicts, errors, or ambiguities contained in the bid package or between the contents of
the bid package and the Project site.
2. PRE-BID COMMUNICATION AND INTERPRETATION OF THE BID PACKAGE
2.1. Any bidder that discovers any apparent conflicts, errors, or ambiguities contained in the bid package or between
the contents of the bid package and the Project site, or that has questions or requires clarification concerning the
bid package or its intent must inform the City in writing as soon as reasonably possible, but no later than five (5)
working days before the date specified in the bid opening. Such notice shall be sent as specified in the Notice to
Contractors for questions concerning the bid package. Questions received less than five (5) working days before
the time specified for opening bids may not be answered.
2.2. Any interpretation, correction or change of the bid package prior to bid opening will be made by addendum signed
by the City Engineer and transmitted to all bid package recipients. No other interpretation or information
concerning the bid package issued prior to the date specified for opening bids will be binding. All addenda signed
by the City Engineer and issued prior to the time and date specified for opening bids will form a part of the
contract documents and must be acknowledged on the bid forms. Any changes, exceptions or conditions
concerning the Project and/or the bid package submitted by any bidder as part of a bid may render that bid non-
responsive.
2.3. The City takes no responsibility for notifying a bidder who does not obtain bid documents from the City or does
not provide the specified Request for Revisions statement to the City. Such bidder may be found non-responsive if
that bidder fails to acknowledge, as set forth herein, any addenda or does not take into account any additional
information provided by the City.
2.4. No other interpretation or information concerning the bid package issued prior to the date specified for opening
bids will be binding. All addenda signed by the City Engineer and issued prior to the time and date specified for
opening bids will form a part of the contract documents and must be acknowledged on the bid forms. Any
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Special Provisions- Page 1 of 31

changes, exceptions or conditions concerning the Project and/or the bid package submitted by any bidder as part of
a bid may render that bid non-responsive.
3. PRE-BID ACCESS TO THE SITE
3.1. Prior to submitting a bid, it will be the sole responsibility of each bidder to conduct any additional examination,
investigation, exploration, test, study or other inquiry and to obtain any additional information pertaining to the
physical conditions (including surface, subsurface, and underground utilities) at or near the Project site that may
affect the cost, progress, or performance of the Project, and that the bidder deems are necessary to prepare its bid
for performance of the Project in accordance with the bid package and contract documents. Bidders seeking any
such additional examination or other inquiries or information concerning the Project will do so at the bidder's sole
expense.
3.2. Bidders seeking to conduct any additional examination or other inquiry at the Project site must request site access
from the City at least two (2) working days in advance. The location of any excavation, boring or other invasive
testing will be subject to approval on behalf of the City and any other agencies with jurisdiction over such testing.
Bidders may not conduct tests at the Project site prior to obtaining City approval. The City may require bidders to
execute an access agreement or encroachment permit prior to approving testing at the Project site. Once approved
testing is complete, bidders shall fill all trenches or holes, restore all pavements to match the existing structural
section, and otherwise clean up and restore the test site to its pre-test condition solely at the bidder's expense.
3.3. The Bidder's attention is directed to the requirements of Section 2-1.30, "Job Site and Documentation
Examination," of the Standard Specifications and these Special Provisions.
4. BIDDING PROCEDURE
4.1. Bids shall be delivered to the City of Grass Valley, Engineering Division, 125 East Main Street, Grass Valley, CA
95945, no later than the time and date specified in the Notice to Contractors. Bids will be opened and read publicly
at that time. Bids that are submitted late according to the time shown on the official bid clock located in City Hall
will be returned unopened. Telephones for use by bidders are not available at the City offices.
4.2. In accordance with California Public Contract Code Section 20170, bids must be presented under sealed cover.
Bids must be submitted using the proposal forms furnished with the bid package. Bids must include all documents
provided in the Proposal. Bids must bear the bidder's legal name and be signed by a representative authorized to
bind the bidder. Bids shall be typed or written in ink. Corrections may be made if initialed by the bidder. No oral
or telegraphic modifications of bids, including facsimile modifications, will be considered. Bids that are
incomplete or that are not presented on the proposal forms furnished with the bid package may be deemed non-
responsive.
4.3. Each bid must give the full business address of the bidder. Bids of partnerships must furnish the full name of all
partners and must be signed in the partnership name by one of the members of the partnership, or by an authorized
representative, followed by the printed name and title of the person signing. Bids of corporations must be signed
with the legal name of the corporation, followed by the name of the state of incorporation and by the signature and
designation of the president, secretary or other person authorized to bind the corporation. The name of each person
signing shall also be typed or printed below the signature. Upon request of the City, bidders will furnish
satisfactory evidence of the authority of the person signing the bid. Bids of joint ventures must include a certified
copy of the legal agreement constituting the joint venture.
4.4. No person, firm, corporation, partnership, or legal joint venture may submit more than one bid for the Project.
However, a person, firm, corporation, partnership or legal joint venture that has submitted a subcontract proposal
to a bidder, or that has quoted prices on materials to a bidder may submit a subcontract proposal, quote prices to
other bidders and submit its own bid.
4.5. In accordance with California Public Contract Code Section 20171, all bids must include one of the forms of
security specified in Caltrans Standard Specifications in an amount of at least ten (10) percent of the total of the
bid prices. Bidders that elect to provide bidder's security in the form of a bid bond must execute a bid bond using
the form provided in the bid forms. The bidder's security is tendered as a guarantee that the successful bidder, if
awarded the Project contract, will execute and submit to the City all required bonds, certificates of insurance, and
completed contract forms and enter into a contract with the City within ten (10) working days of receipt of the
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Special Provisions- Page 2 of 31

Notice of Award. The bidder's security of any successful bidder that fails to do so will be forfeited to the City. All
bidders' security not forfeited to the City will be returned once a successful bidder provides all required documents
and enters a contract with the City in accordance with all applicable bid package requirements. Forfeiture of the
bidder's security to the City will not waive or otherwise limit any other remedy available to the City under
applicable law.
4.6. In accordance with California Business and Professions Code Section 7028.15, Public Contract Code Section
20103.5, and as specified in the Notice to Contractors, all Project work must be performed by properly licensed
contractors and subcontractors with active licenses in good standing as of the date and time specified for bid
opening, or, if the Project involves federal funds, no later than the time the Project contract is awarded. Bidders
must verify their Contractor's license number and license expiration date on the proposal cover page under penalty
of perjury. Bids that do not satisfy applicable licensing requirements will be considered non-responsive and
rejected and may subject the bidder to criminal and/or civil penalties. In addition, all licenses shall remain in effect
throughout the term of the contract.
4.7. Bids may be withdrawn prior to the time set for bid opening by a written request signed by an authorized
representative of the bidder filed with the City Engineer. The bid security submitted with bids so withdrawn will
be returned to the bidder. Bidders that have withdrawn their bid in accordance with this provision may submit a
new bid prior to the time set for bid opening in accordance with all applicable bid package requirements. Bids may
not be withdrawn during the ninety-day period after the time set for bid opening except as permitted by law
pursuant to California Public Contract Code Section 5100 and following. Any other bid withdrawal will result in
forfeiture of the bidder's bid security to the City.
4.8. In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will
assign to the purchasing body all rights, title and interest in and to all causes of action it may have under Section 4
of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700]
of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, services or
materials pursuant to the public works contract or the subcontract. This assignment shall be made and become
effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment to
the parties.
5. BID PROTESTS
Any protest of the proposed Project award must be submitted in writing to the City no later than 5:00 PM on the third
business day following the date of the bid opening.
5.1. The initial protest must contain a complete statement of the basis for the protest.
5.2. The protest must state the facts and refer to the specific portion of the document or the specific statute that forms
the basis for the protest. The protest must include the name, address, and telephone number of the person
representing the protesting party.
5.3. The party filing the protest must concurrently transmit a copy of the initial protest to the apparent low bidder.
5.4. The party filing the protest must have actually submitted a bid for the Project. A subcontractor of a party filing a
bid for the Project may not submit a bid protest. A party may not rely on the bid protest submitted by another
bidder, but must timely pursue its own protest.
5.5. The procedure and time limits set forth in these Instructions to Bidders are mandatory and are the bidders' sole and
exclusive remedy in the event of a bid protest. Any bidder's failure to fully comply with these procedures shall
constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant
to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of
any other legal proceedings.
5.6. The City shall review all timely protests prior to award of the Project. The City shall not be required to hold an
administrative hearing to consider any protests, but may do so at its option. At the time of the City Council's
consideration of the Project award, the City Council shall also consider the merits of any timely protests. The City
Council may either reject the protest and award to the lowest responsible bidder or accept the protest and award
WASTEWATER TREATMENT PLANT BOILER REPLACEMENT PROJECT Special Provisions- Page 3 of 31

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:

City of Monrovia

Bid Due: 8/19/2026

RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and

City of Visalia

Bid Due: 9/03/2026

0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK

City of Los Angeles

Bid Due: 8/11/2026

RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL

County of San Diego

Bid Due: 8/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.