KITCHEN REMODEL

Location: Georgia
Posted: May 11, 2026
Due: May 15, 2026
Agency: City of College Park
Type of Government: State & Local
Category:
  • 73 - Food Preparation and Serving Equipment
Solicitation No: 26-54
Publication URL: To access bid details, please log in.
Bid Number: 26-54
Bid Title: KITCHEN REMODEL
Category: CP - Training
Status: Open
Description:

The City is seeking quotes from qualified vendors to provide kitchen renovation services, including demolition, repairs, modifications, and installation of new fixtures, cabinetry, countertops, appliances, flooring, and related improvements.

Publication Date/Time:
5/8/2026 3:00 AM
Closing Date/Time:
5/15/2026 3:00 PM
Submittal Information:
www.bidnetdirect.com//cityofcollegepark
Related Documents:

Attachment Preview

CITY OF COLLEGE PARK Contracts and Procurement Department
Attention: Carl Hall, Purchasing Department
3667 Main Street. City Hall
College Park, Georgia 30337
Email: Carlton.Hall@collegeparkga.gov Phone: (404)-767-1537ext. 1500
RE: REQUEST FOR QUOTE NO. 26-54
KITCHEN REMODEL-FIRE DEPARTMENT
OBJECTIVE
PURPOSE
The City is seeking quotes from qualified vendors to provide kitchen renovation services, including
demolition, repairs, modifications, and installation of new fixtures, cabinetry, countertops, appliances,
flooring, and related improvements. The project aims to enhance functionality, improve efficiency,
modernize the appearance of the space, and ensure the kitchen meets current operational, safety, and
facility standards while minimizing disruption to ongoing operations
MINIMUM QUALIFICATIONS & GENERAL REQUIREMENTS
The contractor must be properly licensed and insured and experience with similar office or
government facility renovations. The contractor shall comply with all applicable federal, state, and
local codes and safety standards, including OSHA. The contractor must be able to work in an
occupied facility, coordinate with staff to minimize disruption, and manage project schedules to
ensure timely completion. Responsibilities also include obtaining required permits, maintaining a
safe and clean worksite, and properly handling and relocating existing furniture and equipment as
directed.
SCOPE of SERVICE
. 1. Cabinetry Supply and Installation
Contractor shall furnish and install a complete Slim Shaker-style kitchen cabinet package,
including all base, wall, specialty, and tall pantry cabinetry as specified below:
36" Lazy Susan base cabinet (1)
33" Lazy Susan base cabinet (1)
36" sink base cabinet (1)
36" single drawer / 2-door base cabinet (2)
12" three-drawer base cabinet (1)
33" three-drawer base cabinet (1)
36" three-drawer base cabinet (1)
21" three-drawer 650 base cabinet (1)
36" two-door base cabinet (1)
15" trash can base cabinet (2)
24" x 36" corner wall cabinet (1)
36" x 36" two-door wall cabinets (5)
15" x 36" open shelf wall cabinets (2)
18" x 36" glass-front wall cabinets (2)
24" x 96" pantry cabinet (1)
All cabinetry shall include proper installation, leveling, securing, and alignment per manufacturer
specifications.
Trim, Molding, and Finish Carpentry
Provide and install all necessary finish materials, including:
25 linear feet of base molding
25 linear feet of crown molding
6" x 96" filler board (1)
3" x 36" filler boards (3)
3" x 30" filler boards (3)
3" x 96" light rail molding (4)
All trim shall be installed to ensure a finished, seamless appearance consistent with cabinetry
design.
Countertops
Provide and install custom L-shaped stainless steel countertop, fabricated to field
measurements and installed with proper support and sealing.
Plumbing Allowance
Faucet allowance included for selection and installation of standard kitchen faucet
assembly.
Tile Work and Flooring Preparation Materials
Contractor shall furnish all materials and labor required for tile installation, including:
Porcelain tile allowance (material only)
50 lb bags of thinset mortar
25 lb bags of grout
Tile leveling system packs (3)
SDS scaling chisel bit (3) for surface preparation as needed
Pre-taped plastic roll for protection/masking
Painter’s tape (1 roll)
Tile installation accessories as required for proper installation
Fasteners and Construction Materials
Provide all miscellaneous construction fasteners and adhesives necessary for installation, including:
1 box (75 count) Tapcon screws
1 box (300 count) GRK trim head screws
Caulk tubes (3)
Cabinet touch-up kits (3)
12-inch masking paper rolls (2)
Painting and Finishing Materials
Provide two (2) 1-gallon buckets of paint for touch-up and finish work as required.
General Requirements
All work shall comply with applicable building codes and manufacturer installation
requirements.
Contractor is responsible for field verification of all measurements prior to fabrication.
Installation shall include cleanup and removal of construction debris upon completion.
All cabinetry, trim, and finishes shall be installed plumb, level, and securely fastened.
Ensure all electrical systems remain operational; modify outlets if needed to support new
layout.
INSURANCE REQUIREMENTS
Within ten (10) days of Notice of Award, and at all times that this contract is in force, the
contractor shall obtain, maintain, and furnish the City of College Park, Certificates of
Insurance from licensed companies doing business in the State of Georgia and acceptable to
the City of College Park covering:
1.
Worker’s Compensation
-
In accordance with O.C.G.A. Title 34, Chapter 9, as
amended
2.
Business Auto Policy
-
Not less than $500,000.00
3.
Commercial General
Liability
-
Minimum $1,000,000.00/claim
$2,000,000.00/occurrence for Personal Injury, Bodily
Injury, and Property Damage Liability
4.
Professional Liability
-
Not less than $1,000,000.00/occurrence
Copies of these Certificates of Insurance shall be furnished to the City of College Park prior to
execution of the contract. Such policies shall be non-cancellable except on a thirty-day (30)
written notice to the City of College Park.
1. The CITY OF COLLEGE PARK (and any applicable Authority) will be shown as an
additional insured on General Liability, Auto Liability, and Professional Liability
policies and noted accordingly on the Certificate of Insurance.
2. The cancellation provision should provide 30 days’ notice of cancellation.
3. Certificate Holder shall read:
City of College Park, Ga.
3667 Main Street
College Park, Ga. 30337
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

.../CON/APD/2604-1260171/ Demolition & Asbestos Abatement Services SOQ Active 5/30/26 12:21 AM 5/30/26 12:21 ...

City of Atlanta

Bid Due: 6/18/2026

...Fire Station #9-Demolition & New Exterior Metal Shell Troup County Board Of Commissioners ...

State Government of Georgia

Bid Due: 6/09/2026

...SOQ/CON/APD/2604-1260171/ Demolition & Asbestos Abatement Services Atlanta, City Of Jun 01..., 2026 @ ...

State Government of Georgia

Bid Due: 6/18/2026

...DATE: May 1, 2026 Fire Station #9 - Demolition & New Exterior Metal ...

Troup County

Bid Due: 6/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.