| Location: | Georgia |
|---|---|
| Posted: | Oct 22, 2025 |
| Due: | Nov 20, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66420-NONST-2026-000000010 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66420-NONST-2026-000000010 | Hwy 80 Water Extension Phase 2 (PE23218) | Brooklet, City Of |
Oct 22, 2025 @ 04:43 PM
|
Nov 20, 2025 @ 11:00 AM
|
Start Date: Oct 22, 2025 @ 04:43 PM ET
End Date:
Nov 20, 2025 @ 11:00 AM ET
Sealed bids for construction of Highway 80 Water Extension Phase 2 will be received until November 20th, 2025, 11:00 AM at the City of Brooklet City Hall at 104 Church Street, Brooklet GA at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: The City of Brooklet Highway 80 Water Extension project includes, but not limited to, installation of approximately 5,150 LF of 12¿ C-900 PVC watermain on Highway 80 from Joiner Road to Cromley Road. Watermain installation methods will include open cut and directional bore installation. The project will also consist of pavement replacement, sediment control, traffic control, and grassing. Time allotted for completion of work is ninety (90) calendar days. All Work shall be completed in accordance with the plans & specifications. Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from the issuing office, Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable). All questions regarding this project should be directed to lindsey@parker-engineering.com at the issuing office. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid. The Scope of Work as described herein is defined as ¿utility contracting¿ in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a ¿Utility Contractor¿. This project is subject to BABAA. Funding is to be provided by Brooklet & the SEID grant.
| Code | Description |
| 91360 | Construction, Water System, Plants, Main and Service Line |
Lindsey Bashlor
lindsey@parker-engineering.com
9127647722

With GovernmentContracts, you can:
...and Repair 94155 HVAC Systems, Power Plant, Maintenance and Repair 89024 Filtration Equipment, ...
State Government of Georgia
Bid Due: 7/31/2026
...-build services to replace aging chilled-water plant equipment, improve electrical and controls... DISEASE ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 6/15/2026
...Conservation Unit requires contractor assistance to replace the Wadsworth greenhouse control systems... Follow ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/11/2026
...?s SCADA monitoring and control system at one (1) office location, with Remote ...
State Government of Georgia
Bid Due: 6/30/2026