| Location: | Utah |
|---|---|
| Posted: | Jul 17, 2025 |
| Due: | Aug 11, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | JBID255-25-1 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work includes but is not limited to the installation of approximately 279 LF of 12” PVC sanitary sewer pipe, 100 LF of 24” Steel casing and carrier pipe installed via tunneling/boring under the Jordan and Salt Lake Canal, excavation of launching and retrieval shafts, installation of 3 new 60-inch sanitary sewer manholes, connection to the existing sewer system, connection and extension of existing sewer laterals, removal of 2 existing sanitary sewer manholes, abandonment of 3 existing sanitary sewer manholes, removal and replacement of existing storm drain infrastructure, removal and replacement of asphalt pavement, sidewalk, curb and gutter, and landscaping, and sanitary sewer bypass pumping during the construction process.

With GovernmentContracts, you can:
...Name Annabella Irrigation Canal Enclosure Bid Closing Date 06/26/2026 02:00 PM MDT City ...
Franson Civil Engineers
Bid Due: 6/26/2026