| Location: | South Carolina |
|---|---|
| Posted: | Jul 16, 2025 |
| Due: | Jul 25, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | D50-6147-PD |
| Publication URL: | To access bid details, please log in. |
Exterior waterproofing of the Wade Hampton Building basement and the underground pedestrian tunnel which is utilized to access the McEachern Parking Garage by the Wade Hampton and Calhoun Buildings, The exterior subsurface waterproofing material for the Wade Hampton Building and pedestrian tunnel has deteriorated, leading to water infiltration in the Wade Hampton basement and the pedestrian tunnel.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Method: Design-Bid-Build Construction Cost Range: $2,800,000 to $3,000,000 Agency Project Coordinator... DESIGN-BID-BUILD CONSTRUCTION ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026