| Location: | Connecticut |
|---|---|
| Posted: | Oct 23, 2025 |
| Due: | Nov 25, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 33140 |
| Publication URL: | To access bid details, please log in. |
1. Replacement of Seven (7) Overhead Garage Doors. 2. Removal and installation of New Fire Department Roadside Electronic Sign. 3. Installation of Automatic 400A Generator Transfer Switch to integrate with existing Generator. 4. Replacement of existing heating and hot water system, domestic water tank and three (3) A/C units. Removal of underground oil tank. Installation of high-efficiency propane fired heating, hot water and cooling system. Installation of one (1) above ground 1,000 gallon propane tank. 5. Construction of 12’x 24’ Storage Building with 12’x 16’ pavilion. 6. Replacement of existing doors and windows with new energy-efficient units with the. Installation of new door lock system.
Wendy O'Connor 9 Devotion Road Scotland CT, 06264 United States Tel: 860-423-9634 ext 1 execadmin@scotlandct.org Michael Gurnack selectman1@scotlandct.org (860) 617-4371

With GovernmentContracts, you can:
Sodium Hypochlorite 12.5% Bleach, Delivery The Town of Killingly, Connecticut ("Town") invites sealed
State Government of Connecticut
Bid Due: 7/13/2026
GROTON COMMUNITY CENTER IRRIGATION SYSTEM The name of the Project is "Groton Community
State Government of Connecticut
Bid Due: 7/09/2026
TPL COB_RFI_06122026 The State of Connecticut Department of Social Services (DSS), the single
State Government of Connecticut
Bid Due: 7/14/2026
Sodium Bioxide, Delivery The Town of Killingly, Connecticut ("Town") invites sealed proposals from
State Government of Connecticut
Bid Due: 7/13/2026