| Location: | California |
|---|---|
| Posted: | Sep 15, 2026 |
| Due: | Oct 7, 2026 |
| Agency: | Orange County Sanitation District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: SUNFLOWER BYPASS PUMPING PLAN FOR WET SEASON 2026-2027
Addenda: 0
Release Date: 9/15/2026
Due Date: 10/7/2026
OC San requires temporary bypass pumping at its Sunflower Lift Station for Pump#1 during the 2026/2027 wet weather season. The Contractor shall provide a complete temporary bypass pumping system capable of continuously conveying flows ranging from 10MGD to 40MGD under all anticipated wet well and receiving channel wet well levels.
Due to reliability concerns with Sunflower Pump #1 resulting from work performed under project P1-105, additional standby pumping capacity is needed for the upcoming 2026/2027 wet weather season. This project will procure a 40-MGD temporary bypass pumping system to serve as a spare for Sunflower Pump #2 and provide adequate pumping redundancy until the existing pump #1 reliability issue is resolved.

With GovernmentContracts, you can:
Open Date Description Close Date October 26, 2026 Overhaul of Two (2) Boiler
City of Redding
Bid Due: 12/04/2026
Number Title Type NAICS Code(s) Due Date Issue Date Status RQ147064 PUMP ASM
LA Metro
Bid Due: 11/17/2026
Open Date Description Close Date October 26, 2026 Overhaul of Two (2) Boiler
City of Redding
Bid Due: 12/04/2026
Opportunity ID 233026 Organization City of Los Angeles Department Water & Power Stage
City of Los Angeles
Bid Due: 11/24/2026