| Location: | Iowa |
|---|---|
| Posted: | May 28, 2025 |
| Due: | Jun 11, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EK25R0001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers, Rock Island District anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed-Price construction contract for the project known as: Iowa River Basin, Cedar River, Cedar Rapids, IA, Cedar Rapids Flood Risk Management Project, Reach 4 Downstream River Floodwall, Culverts, Pump Station, Road Closure, and Railroad Closure.
The work includes, but is not limited to: site demolition; temporary traffic controls; clearing, grubbing and stripping; pavement removal, levee removal, utility removal, plugging and abandonment of utilities; construction of rigid and flexible pavements, construction of utilities such as storm sewers, manholes and catch basins; construction of cast-in-place concrete floodwall, storm sewer outlets, storm sewer culverts, headwalls and gate wells, geotechnical instrumentation and relief wells, trench and toe drains, and construction of levee embankment.
NAICS Code: 237990
Size Standard: $45,000,000.00
Estimated Range: Between $25,000,000 and $100,000,000
Unrestricted, Best Value Trade-Off

With GovernmentContracts, you can:
...-509-1373 Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional... West Des Moines Iowa ...
Iowa State University
Bid Due: 10/13/2026
...Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional: Alyssa Iverson...@mbionline.com McGraw-Hill Construction Dodge ...
Iowa State University
Bid Due: 10/29/2026
...Cho namho-cho@uiowa.edu Estimated Construction Cost: $159,503.00 Pre Bid Date: 9/29/26 Pre Bid... Location: ...
University of Iowa Facilities Management
Bid Due: 10/14/2026
...estimated construction cost range for this project is $150,000 to $250,000. Completion Dates...: ...
State Government of Iowa
Bid Due: 10/27/2026