USCGC ASPEN reduction gear. This is posting for informational purposes only this has been award VIA JOTFOC.
UPDATED POP: 28July25
Please see attachements for SOW with images.
Reduction Gear Tech Services
USCGC ASPEN (WLB 208)
Inadequate Generator Pinion Flow from Spray Nozzle Repair and Seal Replacement
MFR ID 96-DHCMGH-CP
B Class Model Gear Unit Reduction: NSN 3020-XF-C11-6019
Input RPM 900 Output RPM 254
Gear ration 3.541:1
CGC ASPEN, completed an inspection of the LO System Flow from visible spray nozzles. After recent MRG failures the USCG is trying to identify any LO flow problems that can exacerbate the MRG aging issue prior to each Cutter’s scheduled future “Major Overhauls”. ASPEN, reported after their inspection:
2.1 All Tasking is Performance Based. USCG realizes that it does not make sense to instruct the OEM on how to perform work and repairs on their equipment. Rather it is better, to identify the problem/deficiency and identify the required end result desired to correct.
Remove Upper Generator Pinion Housing Cover Half to Access and clean Spray Nozzles Inside.
1. See Tech Pub Para 6.7.13 Turning Gear/Generator PTO Pinion Cover. (pages attached)
2. Following 6.7.13 as augmented by this SOW remove the Generator PTO Pinion Cover.
2.1. Disconnect Lube Oil Hoses. Cap/bag disconnected hose ends to prevent contamination.
2.2. Remove Breather Cap.
2.3. Remove Magnetic Pick-up Assemblies. Preserve/safeguard for reassembly.
2.4. Remove thru-cap (#108) at PTO end.
2.5. Disassemble the turning gear end as required to free cover and lift. Although TP says “Remove turning gear assembly and generator coupling” it may not be necessary just to remove upper cover of this SOW.
2.6. Remove all hold down fasteners.
2.7. Prepare cover for rigging.
2.8. As Soon as possible cover/close with suitable CLEAN heavy duty covering the Reduction Gear opening to prevent any debris or foreign object entry. Maintain boundary protection until cover is reinstalled.
2.9. Rig to landing area where cover internals can be hand cleaned, and spray nozzles removed/cleaned/and inspected.
2.10. In concurrence with Cutter’s EO that work is completed, rig the cover back into position.
2.11. Reconnect and torque all fasteners and remove items.
2.12. Torque values can be found in MPC WLB-225 M-A-16012 “MAIN REDUCTION GEAR (MRG) EXTERNAL HOUSING AND HOLD DOWN BOLTS INSP/CHK”.
2.13. Retorque the disturbed MRG pinion cover hold-down bolts after 50 hours of operation.
The CTR will travel to and perform work on board CGC ASPEN 4688 Homer Spit Rd.
Homer, AK 99603
PERIOD of Performance
The period of performance for this contract will be up to 7 days on site 8-hour days period during an agreed upon time between 07 JUL 25 and 01 AUG 25
The primary place of performance will be onboard:
CGC ASPEN (WLB 208)
4688 Homer Spit Rd.
Homer, AK 99603
Technicians to support chain falling, lifting, interference removal and assistance with L/O analysis.
Provide name of technician to crew prior to arrival and good contact information.
Any cutter site visits will be coordinated through the cutter POC.
CWO Justin Schmidt
CGC ASPEN (WLB 208)
Pers Cell: 715-892-2824
Email: Justin.E.Schmidt@uscg.mil
6.2 Off site coordination: CWO Nathan Kirchner
Work Cell: (216) 577-1230
Email: Nathan.P.Kirchner@uscg.mil

With GovernmentContracts, you can: