Q26000856 HVAC Units, Removal and Installation for Kalaupapa SettlementGeneral InformationSolicitation Number
Q26000856
version:
01
Status
ReleasedDepartmentHealthDivisionCommunicable Disease and Public Health Nursing DivisionIslands (where the work/delivery is to be performed)
MolokaiCategoryGoods and ServicesRelease Date 10/16/2025Amendment Date & Time10/23/2025 12:30 PMAmendment Reason
Amended Offer Due Date & Time from 10/23/25 at 4:00pm to 10/30/25 at 4:00pm.Offer Due Date & Time10/30/2025 04:00 PMDescriptionThe State of Hawaii Department of Health, Kalaupapa Settlement (DOH) is seeking to remove four (4) existing split-type HVAC units and install four (4) new, energy-efficient split-type HVAC units in Kalaupapa, Molokai, Hawaii that meet all applicable manufacturer, federal, state, and local codes, regulations, and standards.Contact PersonNewell, SaraEmail
sarabeth.newell@doh.hawaii.gov
Phone808-733-4692General CommentsThe State of Hawaii Department of Health, Kalaupapa Settlement (DOH) is seeking to remove four (4) existing split-type HVAC units and install four (4) new, energy-efficient split-type HVAC units in Kalaupapa, Molokai, Hawaii that meet all applicable manufacturer, federal, state, and local codes, regulations, and standards. All labor, equipment, materials, travel, taxes, storage, and delivery costs must be included in the total price. All HVAC units and related equipment and materials must be new. Date of delivery and installation to be determined and coordinated with the General Construction and Maintenance Supervisor, Pa‘oneakai Lee-Namakaeha or Kalaupapa Administrator, John Herbstritt. Onsite storage, vehicle transportation, and housing within Kalaupapa Settlement will be provided by DOH. Installation of equipment must be in proper working order including all associated plumbing and electrical. The Contractor shall provide all labor, tools, materials, and equipment for safely removing four (4) existing HVAC units and installing the four new recommended HVAC systems. The Contractor shall install all associated components, including refrigerant lines, electrical connections, controls, and condensate drains. The Contractor shall ensure compatibility with existing power supply. Please review attached documents: "HVAC Scope of Work," "APPENDIX A," and "APPENDIX B" for specifications and details on deliverables, including warranty.Procurement OfficerBaron ChanAttachments
HVAC Scope of Work.pdf
APPENDIX A.pdf
APPENDIX B.pdf
103D-1 General Conditions.pdf
Download All
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
to this Solicitation), to:
Newell, Sara.
Q26000856 HVAC Units, Removal and Installation for Kalaupapa SettlementLine Items
#
Title
Quantity
Unit of Measure
Commodity Code
Code Table
|
Commodity Code
|
Description
|
|
238210
|
Electrical equipment and appliance installation
|
|
238220
|
Heating, ventilation and air-conditioning (HVAC) contractors
|
|
238220
|
HVAC (heating, ventilation and air-conditioning) contractors
|
GeneralQuantity1Unit of MeasureJOBTitleHVAC Units, Removal and Installation for Kalaupapa SettlementDescriptionThe State of Hawaii Department of Health, Kalaupapa Settlement (DOH) is seeking to remove four (4) existing split-type HVAC units and install four (4) new, energy-efficient split-type HVAC units in Kalaupapa, Molokai, Hawaii that meet all applicable manufacturer, federal, state, and local codes, regulations, and standards. All labor, equipment, materials, travel, taxes, storage, and delivery costs must be included in the total price. All HVAC units and related equipment and materials must be new. Date of delivery and installation to be determined and coordinated with the General Construction and Maintenance Supervisor, Pa‘oneakai Lee-Namakaeha or Kalaupapa Administrator, John Herbstritt. Onsite storage, vehicle transportation, and housing within Kalaupapa Settlement will be provided by DOH. Installation of equipment must be in proper working order including all associated plumbing and electrical. The Contractor shall provide all labor, tools, materials, and equipment for safely removing four (4) existing HVAC units and installing the four new recommended HVAC systems. The Contractor shall install all associated components, including refrigerant lines, electrical connections, controls, and condensate drains. The Contractor shall ensure compatibility with existing power supply. Please review attached documents: "HVAC Scope of Work," "APPENDIX A," and "APPENDIX B" for specifications and details on deliverables, including warranty.Attachments
Download All
Print
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
to this Solicitation), to:
Newell, Sara.