MG00497 (WBS# GMR07.ALA.1P, GMR07.ALA.1N AND GMR07.ALA.2P) CULVERT RESTORATION USING METHOD B FORM & FOLD LINERS, DEWATERING, REPAIR AND INSTALLATION

Location: North Carolina
Posted: Feb 26, 2026
Due: Mar 5, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
  • GMR07.ALA.1P, GMR07.ALA.1N AND GMR07.ALA.2P)
    POC
    MG00497 (WBS# GMR07.ALA.1P, GMR07.ALA.1N AND GMR07.ALA.2P) CULVERT RESTORATION USING METHOD B FORM & FOLD LINERS, DEWATERING, REPAIR AND INSTALLATION
  • Attachment Preview

    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    JOSH STEIN
    GOVERNOR
    February 26, 2026
    DANIEL H. JOHNSON
    SECRETARY
    ADDENDUM #1
    MEMORANDUM TO: Mandatory Pre-Bid Attendees
    FROM:
    Abdou Salami Yaya
    Division Seven Assistant Contract Engineer
    SUBJECT:
    Mandatory Pre-Bid Meeting Minutes for CULVERT RESTORATION
    USING METHOD B FORM AND FOLD LINERS, DEWATERING,
    REPAIR AND INSTALLATION Contract MG00497 (Alamance County)
    On February 23, 2026, a Mandatory Pre-bid Conference was held at North Carolina Department of
    Transportation’s Office located at 1584 Yanceyville Street in Greensboro, NC. The following people
    were in attendance: List of Individuals in attendance:
    Name
    Jennifer A. Sour
    Abdou Salami Yaya
    Antoine G. White
    James M. Walker
    Albert Pugliese
    Chauncey Starkey
    Zach Emlinger
    Courtney Hazen
    Department
    Division Seven Contract Engineer
    Division Seven Assistant Contract Engineer
    Assistant Division Maintenance Engineer
    Alamance County Maintenance Engineer
    Proshot Concrete
    Atlantic Industrial Coatings
    Applied Polymerics
    Nu Pipe
    Memo has been placed on the Bidding and Letting Site and must be included in your
    submittal as an addendum.
    After each person introduced themselves, Jennifer Sour (Division Seven Assistant Contract
    Engineer) opened the mandatory pre-bid meeting for MG00497, culvert restoration
    contract in Alamance County at 1:00 pm on Monday February 23, 2026, in Division 7
    Project Delivery room with introductions and overview of the meeting. She mentioned that
    we were meeting that day for Pre-Bid Meeting for culvert restoration using method B form
    and fold liners, dewatering, repair and installation Contract MG00497 (Alamance County)
    on various primary and secondary routes to go over the contract and ask questions about
    the line items or provide specifics for any clarification. She also said:
    Mailing Address:
    NC DEPARTMENT OF TRANSPORTATION
    DIVISION SEVEN
    1584 YANCEYVILLE STREET
    GREENSBORO, NC 27405
    Telephone: (336) 487-0075
    FAX: (336) 334-3637
    Customer Service: 1-877-368-4968
    Website: www.ncdot.gov
    Location:
    1584 YANCEYVILLE STREET
    GREENSBORO, NC 27405
    This type of contract using this method is the first one in the division
    Jennifer thinks Category B Fold and Form flexible liners, Pre-Installation
    Inspection, Pipe Clean-out, Grouting Host Pipe, Inlet & Outlet Sealing, De-
    Watering is straight forward
    A disposal plan must be submitted to the engineer at least 10 days before
    installation is required and will be sent to Jimmy Walker.
    The contract is as needed; initial locations are TBD (to be determined).
    The contact will use Method B. specification “fold and form flexible line”, a new
    approach for Division seven
    Special provisions were adapted from existing pipe rehabilitation specifications
    The first inspection shall take place between 90 and 100 calendar days after
    completion of installation for each culvert or system to a single outfall
    Jennifer thinks it’s straightforward for installation and cleanup
    The rest of the specifications in section R are all related to updates to various traffic
    items
    The meeting addenda will be distributed as meeting minutes; attendees must sign
    to acknowledge receipt.
    To bid contractors must print and mail the entire contract, including all pages and
    addenda
    Maintenance contracts are typically mail-in, large construction projects are often
    electronic
    All bidder questions should be routed through me (Jennifer Sour) to ensure
    consistent information distribution
    Jennifer asked Jimmy Walker if he had any information to add.
    Jimmy Walker said:
    The submittal will be Send to the County Maintenance Engineer for the county
    where work occurs (e.g. Jimmy Walker for Alamance, Orange CME for Orange
    County, etc.)
    He has 10 to 12 pipes in Alamance County ready for this work. He aims to complete
    and invoice this initial work before the July 1 fiscal year budget.
    Turnaround for new project usually takes a couple of weeks but it can be as fast the
    next day depending on the contractor’s availability
    We have a table here in hotspot designated locations, currently it’s an as needed
    contract, we have TBD
    Jimmy Walker does not think the identified pipes are in a live steam and will not
    need much cleaning and de-watering
    Q&A:
    Q. Jennifer asked: if anyone has questions about De-Watering
    A. No questions
    Q. Jennifer asked: if anyone has questions about Post Installation Inspection
    A. No questions
    Q. Jennifer asked: if anyone has questions about three pay items (Pre Installation
    Inspection, (Size) Pipe Rehabilitation Fold & Form Liner, De-Watering)
    A. No questions
    Q. Jennifer asked: if the contract can be used by all counties
    A. Yes, the contract can be used by all counties
    Q. Can we change Alamance County to all counties
    A. No It’s fine
    Q. Jennifer asked: Any questions with Post installation inspection
    A. No questions
    Q. Jennifer asked: Any questions on the pay items in the back of the contract
    A. No questions
    Q. Jennifer asked: Are there any questions about traffic control
    A. No questions
    Q. Can the identified pipes be available to us
    A. Yes
    Q. Jennifer asked: Any final questions
    A. No questions
    Meeting ended at approximately 1:15pm
    MG00497 NA
    R-1
    Alamance County
    Designated Locations and Allowable Methods
    Site Latitude Longitude County Route
    (decimal (decimal
    degrees) degrees)
    1 36.151466 79.499557 Alamance 1666 NC 87
    Elon NC
    Allowable Liner Notes
    Categories
    Fold and Form
    Flexible Liner
    MP-001-00281
    (Slip Line)
    24” Terracotta
    44’ Long
    2 36.175407 79.352414 Alamance 3505 Fleming Fold and Form
    Grahm Rd, Flexible Liner
    Burlington
    3 36.178296 79.350808 Alamance 3623 Fleming Fold and Form
    Grahm Rd, Flexible Liner
    Burlington
    4 36.180566 79.349753 Alamance 3712 Fleming Fold and Form
    Grahm Rd, Flexible Liner
    Burlington
    5 36.163616 79.354926 Alamance 3712 Fleming Fold and Form
    Grahm Rd, Flexible Liner
    Burlington
    6 36.169352 79.356079 Alamance 3251 Fleming Fold and Form
    Grahm Rd, Flexible Liner
    Burlington
    7 36.126805 79.499973 Alamance 1320
    Fold and Form
    Shallowford Flexible Liner
    Church Rd,
    Elon
    8 36.164957 79.355435 Alamance 3281 Fleming Fold and Form
    Grahm Rd, Flexible Liner
    Burlington
    TBD TBD
    TBD
    Alamance TBD
    Fold and Form
    Flexible Liner
    MP-001-00846
    (Slip Line)
    18” RCP
    48’ Long
    MP-001-00847
    (Slip Line)
    18” Concrete
    48’Long
    MP-001-00848
    (Slip Line)
    18” Concrete
    42’Long
    MP-001-00839
    (Slip Line)
    18” Concrete
    42’Long
    MP-001-00842
    (Slip Line)
    18” Concrete
    42’Long
    MP-001-01647
    (Pig up and
    Replace)
    24”
    48’Long
    MP-001-00843
    18” Concrete
    56’Long
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...Solicitation Number: 487-113 Project Title: Hole 10 Culvert Replacement CT Myers Golf Course... ...

    State Government of North Carolina

    Bid Due: 6/09/2026

    ...Bid Number: 26-061726 Bid Title: Bid 26-061726 Ragan and E Russell Culvert Replacements ...

    City of High Point

    Bid Due: 6/17/2026

    ...; CULVERT AT CULVERT #870003 US 276 AT SR 1536 (CASCADE LAKE RD) ...

    Division of Highways

    Bid Due: 6/23/2026

    ..., AND CULVERTS ON NEW BIKE PATH AT TANNERY STATE PARK FROM CASHIERS ...

    Division of Highways

    Bid Due: 6/23/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.