Request for Qualifications for Design-Build Services ? Poe Hall ? Renovation

Location: North Carolina
Posted: May 1, 2025
Due: Jun 6, 2025
Agency: North Carolina State University
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
May 1, 2025 | Advertisements Request for Qualifications for Design-Build Services – Poe Hall – Renovation By akmangum

The purpose of this Request for Qualifications (“RFQ”) for Design-Build Services
is for North Carolina State University (“NC State”) to solicit responses in accordance with the requirements of this RFQ for the selection of a Design-Builder to join the project team for the upcoming Poe Hall – Renovation project.

Description:

Built in 1970, Poe Hall is a seven-story, concrete frame, 150,982 GSF building in the North Precinct of Main Campus at NC State. In 2023, the presence of hazardous materials was detected in the building; subsequently, the building was vacated, with all occupants relocated to other buildings.

A separate project and Design-Builder will perform all hazardous material abatement and selective deconstruction work. At the end of abatement and selective deconstruction, all that will remain is an intact concrete frame that is ready for the work of this project to begin. The Design-Builder for this project will be expected to coordinate efforts with the Design-Builder of the abatement and selective deconstruction efforts.

This project will comprehensively renovate Poe Hall such that the College of Education may resume normal operations in the building as quickly as reasonably practicable, with NC State and the Design-Builder agreeing to a project schedule prior to execution of the Construction Guaranteed Maximum Price (“GMP”).

Contact:

For specific project inquiries – James Cox (919-219-1381) or jrcox4@ncsu.edu

Pre-submittal Meeting:

A pre-submittal meeting will be held the week of May 12, 2025. Interested Design-Builders are invited to RSVP here . Attendance is not mandatory but is highly encouraged.

Closing Date: 2:00 PM, June 6, 2025

Project Budget:

$160,000,000 – $185,000,000 for NC State’s Total Project Cost, inclusive of all Design-Builder’s costs, other Consultants, Owner’s Contingencies, and Associated Construction Costs,

Reference Documents:

Full Design-Build Request for Qualifications (RFQ) Description

Design-Build Contractor Information Form

Published in Advertisements .

Request for Subcontractor Prequalification- Mann Hall Renovation
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...- Morrisville, NC Messer - Raleigh, NC Metcon - Raleigh, NC Riggs-Harrod Builders ...

North Carolina State University

Bid Due: 6/25/2026

...). Crowder Construction Company (Design-Builder) and Hazen and Sawyer (Design Consultant) have been ...

State Government of North Carolina

Bid Due: 6/25/2026

...Attachment 4 - Form of Design-Build Bridging Agreement between Owner and Design-Builder Exhibit ...

Raleigh-Durham Airport Authority

Bid Due: 6/22/2026

...:00 pm Thursday May 28, 2026 at UNC Pembroke, Facilities Planning, Design & ...

North Carolina State University

Bid Due: 6/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.