| Location: | South Carolina |
|---|---|
| Posted: | May 27, 2025 |
| Due: | Jun 30, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RIA SCIIP Grant A-23-C143 R-23-C143 |
| Publication URL: | To access bid details, please log in. |
Construction of stormwater collection and conveyance infrastructure along the S. Main Street Corridor and S. Nichols Street Corridor. Work to be performed, installation of reinforced concrete piping, associated drainage structures, associated utility relocation, paving, and site restoration. Also construction of a stormwater pocket park with retention pond, pathways, hardscapes at the intersection of S. Main Street and US 76 on Town owned land.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Method: Design-Bid-Build Construction Cost Range: $2,800,000 to $3,000,000 Agency Project Coordinator... DESIGN-BID-BUILD CONSTRUCTION ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026