| Location: | California |
|---|---|
| Posted: | Mar 24, 2026 |
| Due: | Apr 17, 2026 |
| Agency: | Santa Clara Valley Transportation Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | V25326 |
| Publication URL: | To access bid details, please log in. |
Project ID: V25326
Title: BSVII Union Pacific Railroad Trackwork Engineering
Addenda: 1
Release Date: 2/24/2026
Due Date: 4/17/2026
VTA seeks proposals (each a "Proposal") from responsive and responsible qualified firms (each a "Proposer") to design a temporary spur track and related facilities to support the BSVII Project’s muck off haul operations. The work is essential to facilitate the transport of material generated by the BSVII Project from the Newhall Yard site to the Alviso Salt Ponds in San Jose.
BART Silicon Valley Phase II (“BSVII”) is an approximately six-mile, four-station extension from the BSV “I” terminus at the Berryessa/North San José BART Station to the Santa Clara station in the City of Santa Clara. BSVII is planned to include a single-bore tunnel, three underground stations (28th Street/Little Portugal Station, Downtown San José Station, and Diridon Station), one at-grade station (Santa Clara Station), and a maintenance facility at Newhall Yard.

With GovernmentContracts, you can:
Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:
City of Monrovia
Bid Due: 8/19/2026
RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and
City of Visalia
Bid Due: 9/03/2026
0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK
City of Los Angeles
Bid Due: 8/11/2026
RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL
County of San Diego
Bid Due: 8/07/2026