| Location: | New Jersey |
|---|---|
| Posted: | Mar 24, 2026 |
| Due: | May 1, 2026 |
| Agency: | Atlantic County Utilities Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: 40 CFR 62 SUBPART LLL COMPLIANCE TESTING FOR SLUDGE INCINERATORS A AND B
Addenda: 0
Release Date: 3/24/2026
Due Date: 5/1/2026
The Atlantic County Utilities Authority (ACUA) is soliciting Proposals for the sampling and analyses associated with the Title V emission compliance testing. Incinerator “A” is a 16’ 9” outside diameter Envirotech multiple hearth furnace and Incinerator “B” is a 25’ 9” outside diameter Combustion Systems multiple hearth furnace located at the City Island Wastewater Treatment Plant, at 1801 Absecon Blvd., Atlantic City, N.J. 08401. The ACUA will be using the services of Chavond-Barry Engineering Corp. (CBE), Blawenburg, NJ, for coordination of on-site testing and final regulatory reporting.
The Atlantic County Utilities Authority (ACUA) owns and operates a Solid Waste complex in Egg Harbor Township, Atlantic County, NJ, known as the Howard F. Haneman Environmental Park, and a Wastewater Treatment Facility in Atlantic City, Atlantic County, NJ, known as City Island Treatment Plant.
The Solid Waste facility is home to an active landfill, a recycling center, composting site, and ancillary facilities. Also on site is the ACUA’s primary administration building, constructed in 1992, which features a closed-loop geothermal HVAC system. The site is home to a 5.4 MW landfill methane gas to electricity project which provides 100% of the power needs of the Park. The ACUA’s solid waste complex is located at 6700 Delilah Road, in Egg Harbor Township, New Jersey. The site consists of approximately 360 acres with approximately 102 acres representing the landfill footprint.
The Wastewater Treatment Facility has been in operation since 1978 and services 14 communities in Atlantic County. It is home to the Jersey-Atlantic Wind Farm, a 7.5 MW wind farm that is privately owned and from which the ACUA purchases approximately 12 million kWh per year of electricity. In addition, the facility also houses a 500 kW solar PV system.
The ACUA is responsible to the residents of Atlantic County to be financially prudent and environmentally responsible.

With GovernmentContracts, you can:
...Project ID: Title: Microbiological Wastewater Additives Addenda: 2 Release Date: 5/5/2026 Due Date...: ...
TownShip of Wayne
Bid Due: 6/09/2026
...New Dates for questions_0001-IMPROVEMENTS TO MELODY, MIDDLETON & ELKTON WASTEWATER PUMP STATIONS...
Township of Hamilton
Bid Due: 6/02/2026
...MOTORS - REPAIR AND REPLACEMENT AND INSTALLATION FOR A ONE (1) YEAR PERIOD ...
Passaic Valley Sewerage Commission
Bid Due: 6/23/2026
.... S340898-07 HAMILTON TOWNSHIP IMPROVEMENTS TO MELODY, MIDDLETON, AND ELKTON WASTEWATER PUMP STATIONS... ...
Township of Hamilton
Bid Due: 6/02/2026