| Location: | South Carolina |
|---|---|
| Posted: | Dec 4, 2024 |
| Due: | Jan 15, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | A-23-C009-200 |
| Publication URL: | To access bid details, please log in. |
Work includes installation of approx. 24,300 LF of water main, initiating with a system connection near Bamberg's Rhoad Park Elevated Tank. Gate Valves and fire hydrants will be installed along the water amain to allow proper operational control of the distribution system and to serve the customers in the 75 residences that will be provided a public water source as a result of this project.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...19, 2026 - 2:00pm Project Location: Pendleton, SC Project Delivery Method: Design-Bid-Build... qualified ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026