RFP-863 Engineer CHFS WSH Mechanical

Location: Kentucky
Posted: Dec 4, 2024
Due: Dec 10, 2024
Agency: State Government of Kentucky
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
Solicitation No: RFP-785-2500000164-1
Publication URL: To access bid details, please log in.

Description: RFP-863 Engineer CHFS WSH Mechanical

Department: Facilities & Support Services

Buyer: Amanda Greer

Solicitation Number: RFP-785-2500000164-1

Type: Request for Proposals (RFP)

Category: Engineering

Closing Date and Time: 12/10/2024 01:30 PM EST


Buyer Information
Buyer Name
Susan Ward
Buyer Email
Susan.Ward@ky.gov
Buyer Phone
502-226-0335
Important Dates
Issue Date
11/14/2024
Closing Date
12/10/2024 01:30 PM EST
Bid Opening Date
12/10/2024 02:30 PM EST
Last Amended
12/03/2024
Department Information
Category
Construction
Type
Request for Bids
Document Department
785
Status
Amended
Description
RFB-129-25 EDU FFA Camp HVAC Replacement
Group 1
Default
Number of Lines: 1
Line Number Commodity Description Details Requested
1
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded** The following Project Narrative describes Mechanical, Electrical, and Architectural work associated with the HVAC renovation of the Recreation Hall on the Future Farmers of America campus. Mechanical: All existing window air conditioning units and floor finned tube radiators are to be removed. The new mechanical system is a variable refrigerant flow (VRF) system that will utilize refrigerant as the method of cooling/heating. Each classroom will have two (2) wall-mounted indoor units to adequately cool or heat the classroom. The recreation hall will have three (3) fan coil units installed for cooling or heating the space. Condensing units will be installed exterior to the building in two separate locations to decrease the distance of piping installation. A VRF monitoring system will be installed in the recreation hall and can be utilized to control the individual units that are installed. The VRF system will also connect to the campus BAS enabling users to log-in online to view system performance and set any parameters needed. Electrical: The existing panelboard will be replaced with a new panelboard to ensure the safety and reliability of electrical systems when the building is utilized. Existing lighting will be upgraded from fluorescent to LED improving not only the aesthetic of the spaces but has increased lower occupant stimulation levels and provides opportunity to lower operational cost. New exterior lighting will replace the existing exterior lighting. Lighting controls will be upgraded to meet current code requirements. The existing fire alarm system is not compliant with current code requirements. There will be a new voice evacuation fire alarm system and devices for the safety of occupants within the building. Architectural: The existing windows and doors will be replaced with new windows and doors which will improve thermal comfort and building energy efficiency. The exterior and interior finishes are remaining to keep the initial aesthetic of the building.
Specifications
Commodity Code
912
Service From
12/15/2024
Service To
05/16/2025
View Purchase History
Additional Information
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: Construction Manager at Risk (CMAR)-Municipal Building Ref. #: 2026-55 Department...: The City ...

City of Bowling Green

Bid Due: 6/22/2026

...Project: Sun Valley Pool Construction Ref. #: RFP260268 Department: Parks & Recreation Type... ...

City of Louisville, Kentucky

Bid Due: 7/09/2026

...No. Type Title Department Close Date Reference #: 2026-19. Name: Concrete Sidewalk Construction ...

City of Bowling Green

Bid Due: 7/10/2026

...Project: Concrete Sidewalk Construction - Ridgecrest Way Ref. #: 2026-19 Department: Public Works... ...

City of Bowling Green

Bid Due: 7/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.