| Location: | California |
|---|---|
| Posted: | Mar 24, 2026 |
| Due: | Apr 23, 2026 |
| Agency: | Sutter County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | MM31002630N |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes the furnishing of all
labor, materials, equipment, transportation, and services necessary for the FY2025-26 ADA Curb Ramp
Project. The plan requires removal and replacement of existing concrete curbs, gutters, sidewalks, and
installation of under sidewalk drains to bring the facilities up to current ADA standards. Related work
includes, but is not necessarily limited to, removal of asphalt and concrete along with installation of new
concrete curbs, under sidewalk drains and paving to tie into the existing street.

With GovernmentContracts, you can:
...includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work... ...
City of Oroville
Bid Due: 6/23/2026
...Bid:No Overview Summary The work consists of furnishing all labor, materials, tools, equipment... ...
City of Thousand Oaks
Bid Due: 6/24/2026
..., materials, equipment, transportation and services necessary for the Live Oak Canal Bridge ...
Sutter County
Bid Due: 6/25/2026
..., materials, equipment, transportation and services necessary for the Live Oak Canal Bridge ...
Sutter County
Bid Due: 6/25/2026