| Location: | New Mexico |
|---|---|
| Posted: | Jan 8, 2026 |
| Due: | Feb 5, 2026 |
| Agency: | City of Rio Rancho |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 26-002-UT |
| Publication URL: | To access bid details, please log in. |
Project Description: The City of Rio Rancho Water Utility System Division (hereinafter referred to as the City) has over 14 well sites and multiple booster pump station sites. Additional well sites may become active at a later date and all facilities are located in the Rio Rancho area. The Contractor shall provide for repair, replacement, fabrication, modification, rehabilitation, abandonment, and demolition services for mechanical and electrical equipment, piping, and instrumentation in accordance with the terms, conditions, general requirements, and specifications as set forth in the Invitation for Bids (“IFB”).

With GovernmentContracts, you can:
...Follow SRSU - Water System Installation and Upgrade Active Contract Opportunity Notice ID ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 2/17/2029
...is pumped uphill (1,100 vertical feet through 11 miles of 30" raw water ...
City of Santa Fe
Bid Due: 6/16/2026
...removed. Key Advantages: Low footprint 99.9% metal removal in filtrate High water removal ...
ENERGY, DEPARTMENT OF
Bid Due: 6/30/2026