| Location: | Oklahoma |
|---|---|
| Posted: | Feb 2, 2026 |
| Due: | Feb 6, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | A26-034 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
1.The 76th AMXG/567th is requesting utilization of funds for the purchase of one (1) Portable ResistiveLoad Bank.
2.The requested equipment item description / Specifications are outlined below.
a.Quantity of one (1) Portable Resistive Load Bank.
(1)230VAC L-N, 400VAC L-L, 3-Phase, 400 Hz
(2)6-Pin Aircraft Power Receptacle with Shield
(a)Must be supplied in accordance with (IAW) the requirements specified in DrawingLE409-0001.
(b)Suggested sources of supply (Anderson Airmotive part no. 3-498501 OR ITT CannonEA376 IAW dwg. LE409-0001).
(3)Load capacity of 100 kW or more.
(4)Switch to load in increments of 10 kW or less.
(5)Meter to display input frequency, volts, amps, watts.
(6)E/F interlock.
(7)4x BNC female connectors for monitoring of input power voltage, current, and frequency perphase with oscilloscope.
(8)Thermal Protection.
(9)Casters for ease of transport.
(10)Lifting pockets for loading/unloading with forklift.
(11)Noise level not to exceed 85 dB (A) IAW OSHA standard 29 CFR 1910.95.

With GovernmentContracts, you can:
...can carry a load without falling behind. Made with high quality nylon stitching, ...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...and timeline updates. 11 May 26 Uploaded the block 45 Electrical Loads Analysis ...
DEPT OF DEFENSE
Bid Due: 9/15/2026
...26 Uploaded the block 45 Electrical Loads Analysis 06 May 26 Updated and ...
DEPT OF DEFENSE
Bid Due: 9/15/2026
...with the facility heat load. All work shall be completed in full accordance ...
DEPT OF DEFENSE
Bid Due: 7/10/2026