| Location: | Utah |
|---|---|
| Posted: | Nov 19, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24-028 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work consists of landscape and irrigation improvements along Center Street and 800 North within the City of Orem. Construction includes demolition of existing vegetation and surfaces, site grading, limited tree removal, and installation of concrete mow strips and edging. Landscape work will provide new ornamental trees, shrubs, sod turf areas, and alternates for subsurface artificial turf, together with placement of topsoil and mulches including bark, granite fines, decomposed granite, and decorative rock. Irrigation improvements include drip irrigation for planting beds, a subsurface irrigation mat system for turf, new service connections, controllers, backflow assemblies, valves, conduit, and associated appurtenances.

With GovernmentContracts, you can:
...for the construction of the referenced project: Project Description: Removal of existing sod ...
State Government of Utah
Bid Due: 6/09/2026