| Location: | California |
|---|---|
| Posted: | May 2, 2025 |
| Due: | May 16, 2025 |
| Agency: | Yuba Community College District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Proposals are requested from the three designated manufacturers (AstroTurf, Field Turf, and Shaw) with certified installation General contractors an “A” or “B” California Contractor License to complete all of the scope of work per the DSA approved drawings and specifications. This is a DSA prevailing wage project.
Only the three specified Manufacturers, AstroTurf, Field Turf, and Shaw (with associated General Contractors) Firms that are pre-qualified will then have their proposals considered for this project. The District is only accepting proposals through the three specified synthetic turf manufacturers per Request for proposals numbered RFP 25-07a (AstroTurf), RFP 25-07b (Field Turf), and RFP 25-07c (Shaw). No other alternatives or “equal’s” will be considered representing any other manufacturers. The District intends to award a single contract to the selected Turf Company through a Joint Power Authority (JPA) Program, such as Sourcewell, Omnia, or equivalent acceptable public purchasing program. Contractors may submit multiple proposals to each of the three Turf Manufacturers.
Although proposals are requested utilizing the Joint Powers of Authority (JPA) program, this is still also a CUPCCAA project. All General Contractors submitting proposals to the Turf Manufacturers are required to be on the District’s CUPCCAA list of qualified contractors. Contractors can submit the required CUPCCAA form to the District by accessing the form at this web page link, filling it out and submitting it to the District:
https://www.yccd.edu/district-services/fiscal-services/purchasing-2/cupccaa/
RFP 25-07a WCC Soccer Field Construction – AT v2 Final
RFP 25-07a WCC Soccer Field Construction – AT v2 Final PDF Format
Link to RFP’s:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/En1zMJ24cINJqNU0XqwYWpQBJXJ6WUM-F_tbg88P3hJ5cg?e=xkRBIR
Link to DSA Approved Drawings and Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EhKSo_ihjnFDjWsqiMv53SIBgwylPR-O55rPa8EVZjO66Q?e=lJcxgT
Link to Division 0 Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EgacbyMneCVKlstOJrqz4PUBVii4th3TuFtNx79JX1_KTA?e=nw9Bxj
Addendum No. 1:
01_RFP No. 25-07a, b, and c_Addendum No.1
01_RFP No. 25-07a, b, and c_Addendum No.1
Addendum No. 2: Pre-Bid Meeting 4/25 at 1pm
02_RFP No. 25-07a, b, and c_Addendum No.2
Log Sheet Optional Pre-Bid Meeting RFP 25-07a, b, c 4.25.2025
Addendum 3 will be posted 5/05/2025, RFI’s are accepted until 9am on 5/05/2025.

With GovernmentContracts, you can:
...25-26-21MO - Del Sol Turf Installation 25-26-21MO -Notice Inviting Bids.pdf 25-26-21MO - Bid... ...
Jurupa Unified School District
Bid Due: 6/23/2026
...25-26-21MO - Addendum 1.pdf Date: June 4, 2026 Re: 25-26-21MO - Del Sol ...
Jurupa Unified School District
Bid Due: 6/23/2026
...25-26-21MO - Addendum 2.pdf Date: June 5, 2026 Re: 25-26-21MO - Del Sol ...
Jurupa Unified School District
Bid Due: 6/23/2026
..., Softball, and Multi-Purpose Fields, Removal of Natural Turf, Grading and Sub-Surface Preparation..., ...
Lynwood Unified School District
Bid Due: 6/10/2026