| Location: | North Carolina |
|---|---|
| Posted: | Oct 8, 2026 |
| Due: | Oct 26, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 600IFB #27-18-CROWN |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 600IFB #27-18-CROWN |
| Project Title: | IFB #27-18-CROWN MOTORIZED TELESCOPING SEATING SYSTEM FOR CROWN COLISEUM |
| Description: | IFB #27-18-CROWN MOTORIZED TELESCOPING SEATING SYSTEM FOR CROWN COLISEUM |
| Opening Date: | 10/26/2026 2:00 PM |
| Posted Date: | 10/9/2026 |
| Status: | Open |
| Department: | COUNTY OF CUMBERLAND |
|
Solicitation Number
*
600IFB #27-18-CROWN
|
Department
COUNTY OF CUMBERLAND
|
Status Reason
Open
|
|
|
Opening Date
2026-10-26T14:00:00.0000000
|
Posted Date
*
2026-10-08T16:31:56.0000000Z
|
Primary Commodity Code
Seating
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Optional Site Visit: 10/13/26 at 1:30 PM
|
Solicitation Type
*
IFB
|
|
|
Owner
Jessica Hullender
|
|||
|
Description
IFB #27-18-CROWN MOTORIZED TELESCOPING SEATING SYSTEM FOR CROWN COLISEUM
|
|||
ENGINEERING
INVITATION FOR BID #27-18-CROWN
MOTORIZED TELESCOPING SEATING SYSTEM FOR CROWN COLISEUM
Date of Issue: October 8, 2026
Urged and Cautioned Site Visit: Tuesday, October 13, 2026 at 1:30 PM
Questions Due Date: Thursday, October 15, 2026 at 12:00 PM
Bid Due Date: Monday, October 26, 2026 at 2:00 PM
Direct all inquiries concerning this IFB to:
Sophia Pate
Purchasing Manager
Email: CumberlandPurchasing@cumberlandcountync.gov
Phone: 910-678-7743
Bids shall be submitted in accordance with the terms and conditions of this IFB and any addenda issued hereto.
Table of Contents
1.0 PURPOSE AND BACKGROUND .......................................................................................................... 3
2.0 BID INSTRUCTIONS & REQUIREMENTS ........................................................................................ 3
2.1 INVITATION FOR BID DOCUMENT ................................................................................................. 3
2.2 BID SUBMITTAL ................................................................................................................................... 3
2.3 BID QUESTIONS .................................................................................................................................... 4
2.4 URGED AND CAUTIONED SITE VISIT ............................................................................................ 4
2.5 IFB TERMS & CONDITIONS............................................................................................................... 4
3.0 NOTICES TO VENDOR .......................................................................................................................... 5
3.1 PROHIBITED COMMUNICATIONS AND CONFIDENTIALITY ................................................. 5
3.2 BID COMPLIANCE ................................................................................................................................ 5
3.3 BID EVALUATION PROCESS ............................................................................................................. 6
3.4 METHOD OF AWARD .......................................................................................................................... 6
4.0 SCOPE OF WORK & VENDOR'S BID CONTENT REQUIREMENTS .......................................... 6
4.1 SCOPE OF WORK & SPECIFICATIONS .......................................................................................... 6
A. PROJECT SCOPE & OVERVIEW ............................................................................................................... 6
B. REGULATORY AND CODE COMPLIANCE ............................................................................................ 7
C. PRE-APPROVED TIER-1 MANUFACTURERS & MODELS .................................................................. 7
D. MATERIAL AND STRUCTURAL STANDARDS ...................................................................................... 7
E. MOTORIZATION & ELECTRICAL INTEGRATION ............................................................................. 7
F. CHAIR AND SEATING CRITERIA ............................................................................................................. 8
G. DEMOLITION, INSTALLATION & TESTING ......................................................................................... 8
H. SYSTEM WARRANTY .................................................................................................................................. 9
I. COLISEUM FLOOR PROTECTIONS & LIABILITY .............................................................................. 9
J. PROJECT MILESTONES .............................................................................................................................. 9
K. CRITICAL VENUE BLACKOUT PERIODS & FACILITY COORDINATION .................................. 10
4.2 VENDOR'S BID REQUIREMENTS ................................................................................................... 10
A. MANDATORY PRE-BID SUBMITTALS (REQUIRED WITH BID RESPONSE) ............................... 10
B. POST-AWARD SUBMITTALS (REQUIRED PRIOR TO FABRICATION) ........................................ 11
C. COST ............................................................................................................................................................... 11
D. REFERENCES ............................................................................................................................................... 11
5.0 CONTRACT TERMS AND CONDITIONS......................................................................................... 11
5.1 IRAN DIVESTMENT ACT .................................................................................................................. 11
5.2 E-VERIFY .............................................................................................................................................. 12
Page 1 of 18
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
5.3 DIVESTMENT FROM COMPANIES THAT BOYCOTT ISRAEL ............................................... 12
5.4 CONTRACT CHANGES ...................................................................................................................... 12
5.5 CONTRACT TERM .............................................................................................................................. 12
5.6 PRICING ................................................................................................................................................ 12
5.7 ADDITIONAL QUANTITIES ............................................................................................................. 12
5.8 INVOICES .............................................................................................................................................. 12
5.8 PAYMENT TERMS .............................................................................................................................. 12
5.9 APPROPRIATION OF FUNDS ........................................................................................................... 12
5.10 FINANCIAL STABILITY .................................................................................................................... 12
5.11 INSURANCE: ........................................................................................................................................ 13
5.12 GENERAL INDEMNITY ..................................................................................................................... 13
5.13 ENTIRE CONTRACT .......................................................................................................................... 13
5.14 CONTRACT CANCELLATION ......................................................................................................... 13
5.15 LAWS AND ORDINANCES ................................................................................................................ 13
5.16 COMPLIANCE WITH LAWS ............................................................................................................. 13
5.17 CONTRACTOR REPRESENTATIONS ............................................................................................ 13
ATTACHMENT A: INSTRUCTIONS TO VENDORS .................................................................................. 15
ATTACHMENT B: EXECUTION OF BID .................................................................................................... 17
ATTACHMENT C: CERTIFICATION OF FINANCIAL CONDITION ..................................................... 18
Page 2 of 18
| Mailing address for delivery of bid via US Postal Service | Office address of delivery by any other method (special delivery, overnight, or any other carrier) |
|---|---|
| BID TITLE: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum Cumberland County Purchasing Office Attn: Purchasing Manager PO Box 1829 Fayetteville, NC 28302 | BID TITLE: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum Cumberland County Purchasing Office Attn: Purchasing Manager 117 Dick Street 4th Floor, Room 451 Fayetteville, NC 28301 |
| Mailing address for delivery of bid |
|---|
| via US Postal Service |
| Office address of delivery by any other method (special |
|---|
| delivery, overnight, or any other carrier) |
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
1.0 PURPOSE AND BACKGROUND
The telescoping seats at the Cumberland County Crown Coliseum need to be replaced. This IFB includes the demolition
and disassembly of the existing telescoping bleachers and chairs and the purchase, turnkey engineering and installation,
and electrical and integration of a motorized, multi-tiered telescoping seating system.
2.0 BID INSTRUCTIONS & REQUIREMENTS
2.1 INVITATION FOR BID DOCUMENT
The IFB is comprised of the base IFB document, any attachments, and any addenda released before contract award. All
attachments and addenda released for this IFB in advance of any contract award are incorporated herein by reference.
By submitting a bid, the vendor agrees to meet all stated requirements in this section as well as any other specifications,
requirements and terms and conditions stated in this IFB. If a vendor is unclear about a requirement or specification or
believes a change to a requirement would allow for the County to receive a better bid, the vendor is urged and cautioned
to submit these items in the form of a question during the question and answer period in accordance with Section 2.3.
Vendors shall populate all attachments of this IFB that require the vendor to provide information and include an
authorized signature where requested. Failure to include required documents and/or signatures, where requested, will
result in rejection of submitted bids.
2.2 BID SUBMITTAL
Bids, subject to the conditions made a part hereof and the receipt requirements described below, shall be received at the
address indicated in the table below.
Mailing address for delivery of bid Office address of delivery by any other method (special
via US Postal Service delivery, overnight, or any other carrier)
BID TITLE: BID TITLE:
IFB #27-18-CROWN Motorized Telescoping Seating IFB #27-18-CROWN Motorized Telescoping Seating
System for Crown Coliseum System for Crown Coliseum
Cumberland County Purchasing Office Cumberland County Purchasing Office
Attn: Purchasing Manager Attn: Purchasing Manager
PO Box 1829 117 Dick Street
Fayetteville, NC 28302 4th Floor, Room 451
Fayetteville, NC 28301
IMPORTANT NOTE: All bids shall be physically delivered to the office address listed above on or before 2:00 PM
as per the clock in the Purchasing Office of the Finance Department on Monday, October 26, 2026, regardless of the
method of delivery. All risk of late arrival due to unanticipated delay-whether delivered by hand, U.S. Postal Service,
courier or other delivery service is entirely on the vendor. It is the sole responsibility of the vendor to have the bid to the
County department specified by the specified time and date of opening. Any bid received after the bid submission
deadline will be rejected. Public bid opening will be held at 2:00 PM, as per the clock in the Purchasing Office of the
Finance Department on Monday, October 26, 2026, at 117 Dick Street, 4th Floor, Room 451, Fayetteville, NC 28301.
a) Submit one (1) signed, original executed bid response and one (1) electronic copy on a flash drive.
b) Submit your bid in a sealed package. Clearly mark each package with: (1) Vendor name; (2) the IFB number; and
(3) the due date. Address the package(s) for delivery as shown in the table above. Bids will be subject to rejection
unless submitted with the information above included on the outside of the sealed bid package.
Page 3 of 18
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
c) The electronic copy of your bid must be provided on a flash drive. The files shall NOT be password protected, shall
be in .PDF or .XLS format, and shall be capable of being copied to other media including readable in Microsoft
Word and/or Microsoft Excel.
All bid addendums and/or corrections will be posted on the Cumberland County Vendor Self Service site
https://ccmunis.co.cumberland.nc.us/vss/Vendors/VBids/Default.aspx . Vendors who submit a notice of intent to bid to
CumberlandPurchasing@cumberlandcountync.gov will receive addendums by email.
2.3 BID QUESTIONS
Written questions shall be e-mailed to CumberlandPurchasing@cumberlandcountync.gov by 12:00 PM EST on
Thursday, October 15, 2026. Vendors should enter "IFB #27-18-CROWN Motorized Telescoping Seating System for
Crown Coliseum: Questions" as the subject for the e-mail. Questions will not be answered by phone. Question submittals
should include a reference to the applicable IFB section.
Questions received prior to the submission deadline date, the County's response, and any additional terms deemed
necessary by the County will be posted in the form of an addendum to the Cumberland County Vendor Self Service Site,
https://ccmunis.co.cumberland.nc.us/vss/Vendors/default.aspx and shall become an Addendum to this IFB. Vendors
who submit an intent to bid will receive addendums by e-mail. Vendors shall rely only on written material contained
in an Addendum to this IFB. Vendors should not contact any other County employees, besides those listed above,
during the bid process. Vendors who contact any other County employees may be disqualified.
Any questions considered minute in nature or that point to an error in the IFB or that the County determines will produce
information required in order for all vendors to submit a responsible bid, may be answered at the County's discretion
after the specified date and time. Such questions that are received after the deadline are not guaranteed to be answered
and if the questions qualify as "minute in nature" shall be determined at the sole discretion of the County.
2.4 URGED AND CAUTIONED SITE VISIT
Urged and Cautioned Site Visit
Date: Tuesday, October 13, 2026
Time: 1:30 PM Eastern Time
Location: 1960 Coliseum Drive
Fayetteville, NC 28306
Meet at the Loading Dock
Contact #: 910-580-0771
Instructions: Vendor representatives are URGED and CAUTIONED to visit the site and apprise themselves of the
conditions and requirements which will affect the performance of the work called for by this Invitation for Bid. A non-
mandatory site visit is scheduled for Tuesday, October 13, 2026 at 1:30 PM Eastern Time at 1960 Coliseum Drive,
Fayetteville, NC 28306, meet at the Loading Dock.
Vendor is cautioned that any information released to attendees during the site visit, other than that involving the physical
aspects of the facility referenced above, and which conflicts with, supersedes, or adds to requirements in this Invitation
for Bid must be confirmed by written addendum before it can be considered to be a part of this bid.
2.5 IFB TERMS & CONDITIONS
It shall be the vendor's responsibility to read the instructions, the County's terms and conditions, all relevant exhibits
and attachments, and any other components made a part of this IFB, and comply with all requirements and specifications
herein. Vendors also are responsible for obtaining and complying with all Addenda and other changes that may be issued
in connection with this IFB.
Page 4 of 18
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
Questions, issues, or exceptions regarding any term, condition, or other component within this IFB, must be submitted
as questions in accordance with the instructions in Section 2.3 BID QUESTIONS. Vendor's bid shall constitute a firm
offer.
If a vendor desires modification of the terms and conditions of this solicitation, it is urged and cautioned to inquire during
the question period, in accordance with the instructions in this IFB, about whether specific language proposed as a
modification is acceptable to or will be considered by the County. It is the County's sole discretion to accept or reject
requested modifications and/or exceptions.
3.0 NOTICES TO VENDOR
3.1 PROHIBITED COMMUNICATIONS AND CONFIDENTIALITY
PROHIBITED COMMUNICATION: Each vendor submitting a bid, including its representatives, subcontractors, and
suppliers, is prohibited from having any communication with any employees or members of the board of commissioners
of the County except those employees of the County's Finance Department as designated in this IFB. A vendor who
does not comply with this provision may be disqualified from award of a contract.
!IMPORTANT INFORMATION! CONFIDENTIAL INFORMATION: The bid must not contain any information
marked as "confidential" or as a "trade secret" or in any other manner as to indicate that it is information protected by
the Trade Secrets Protection Act ( the "Act") as set out in Article 24 of Chapter 66 of the North Carolina General Statutes,
unless the vendor has noticed the County Finance Department of its intent to designate any information in the
bid as such and received permission from the County Finance Department to do so in writing. Vendor's notice to
the County Finance Department must be in writing and must describe the information for which confidentiality is
requested and explain how the information is a "trade secret" as defined in G.S. 66-152(3). If the County Finance
Department determines the information for which confidentiality is requested is a "trade secret" covered by the Act, it
will notify the vendor how to mark the information in the bid and will identify the measures that County will take to
protect the confidentiality of the information. Vendor's submission of a bid after receipt of this notice from the County
Finance Department shall be deemed to be acceptance of the County Finance Department's statement of how it will
maintain confidentiality. If the County Finance Department determines the information for which confidentiality is
requested is not a "trade secret" covered by the Act, it will notify vendor of that determination. Any bid marked with any
information as "confidential" or as a "trade secret" or in any other manner as to indicate that it is information protected
by the Act in violation of this section shall be regarded as not responsive to the invitation for bid and shall not be
considered.
3.2 BID COMPLIANCE
It is in the best interest of vendors to submit bids that are clear, concise, and easily understood. Bids should provide
information essential for a straightforward and concise description of vendor capabilities to satisfy the requirements of
the IFB specifications.
Vendor may include any optional data not provided for elsewhere and considered to be pertinent to this bid as an
addendum.
Vendors are urged and cautioned to read the IFB completely through as noncompliance with requirements may result in
bid rejection. Section 4.0 requirements and request for information must be in the same order with the same titles as
listed in Section 4.0. Vendor bids should be easy to follow and all sections should be easily identified.
The specifications included in this package describe the services that the County feels are necessary to meet the
performance requirements of this IFB, and shall be considered the minimum standards expected of the Bidder. However,
the specifications are not intended to exclude potential bidders.
Page 5 of 18
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
If the vendor is unable to meet any of the specifications as outlined therein, vendors are advised to submit questions and
concerns regarding the specifications during the question and answer period described in Section 2.3.
If the vendor does not indicate or submit questions or concerns regarding the specifications, the County shall assume it
is able to fully comply with these specifications. The County shall be the sole and final judge of compliance with all
specifications.
The County further reserves the right to determine the acceptability or unacceptability of any and all alternatives or
deviations.
3.3 BID EVALUATION PROCESS
The County shall review all responses to this IFB to confirm that they meet the specifications and requirements of the
IFB. The County shall not be required to hold interviews; however, depending on the number of responses and the
information contained in the responses, the County may decide to conduct interviews with firms of its choice. The County
reserves the right to request clarification of information submitted.
The County reserves the right to request clarification of information submitted.
The County reserves the right to reject any and all bids.
3.4 METHOD OF AWARD
IFB will be awarded based on lowest responsive, responsible bidder method of award.
The County reserves the right to make separate awards to different vendors, to not award, or to cancel this IFB in its
entirety without awarding a contract, if it is considered to be most advantageous to the County to do so.
The County reserves the right to reject all original offers and request one or more of the vendors submitting bids within
a competitive range to submit a best and final offer (BAFO), based on discussions and negotiations with the County, if
the initial responses to the IFB have been evaluated and determined to be unsatisfactory.
4.0 SCOPE OF WORK & VENDOR'S BID CONTENT REQUIREMENTS
4.1 SCOPE OF WORK & SPECIFICATIONS
The telescoping seats at the Cumberland County Crown Coliseum need to be replaced. This IFB includes the demolition
and disassembly of the existing telescoping bleachers and chairs and the purchase, turnkey engineering and installation,
and electrical and integration of a motorized, multi-tiered telescoping seating system.
A. PROJECT SCOPE & OVERVIEW
1. Demolition and Disassembly: Complete turnkey removal, structural teardown, and environmentally
responsible off-site logistics/disposal of the existing five (5) sections of lower-bowl telescoping gym-style
bleachers and chairs. Vendor assumes full ownership of scrap material and must provide a certificate of
sustainable metals-recycling.
2. Turnkey Engineering and Installation: Complete design, precision manufacturing, freight delivery, secure
floor-anchoring, and certified structural verification of a premium, motorized, multi-tiered, forward-folding
upholstered individual chair telescoping system operating over a multi-use concrete coliseum floor slab.
3. Electrical and Integration: Provision of integral system power distribution, clean internal control wiring,
heavy-duty wireless and pendant push-button operational controllers, and failsafe electronic safety interlocks.
Page 6 of 18
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
B. REGULATORY AND CODE COMPLIANCE
Building Codes: The telescoping system must be fully engineered, stamped by a licensed North Carolina
Professional Engineer (PE), and installed to meet or exceed all applicable building codes, including local
standards, IBC, NFPA 102, and the State of North Carolina Building and Electrical Codes.
Americans with Disabilities Act (ADA): Full compliance with ADA Standards for Accessible Design.
System layout must explicitly incorporate standalone accessible seating platforms, integrated flexible
wheelchair cutouts, and dedicated companion seating configurations that seamlessly interface with standard
rows.
C. PRE-APPROVED TIER-1 MANUFACTURERS & MODELS
To establish a strict engineering, material, and aesthetic baseline-and to guarantee a fair, competitive "apples-to-
apples" bidding landscape-all bids must base pricing strictly on the following forward-folding or nose-mount
upholstered individual folding chair product lines. No basic bench bleachers or plain polymer shell modules will be
accepted. Accepted manufacturers and models are listed below:
Hussey Seating Company: Quattro Telescopic Series or Metro Series
Irwin Seating Company: Integra Series or Prestige Series
Interkal LLC: Odyssey Series, Aura Series, or Vision Series
Note: Alternative manufacturers or models must request formal approval via written Addendum by the Questions
Due Date and Time (12:00 PM EST on Thursday, October 15, 2026). Approval is at the sole discretion of the Venue
Owner and Oak View Group.
D. MATERIAL AND STRUCTURAL STANDARDS
Understructure Framework: Heavy-duty, high-tensile structural steel shapes (ASTM A500 Grade B or C).
Standard structural cross-bracing and engineering geometry must restrict lateral sway during capacity athletic
events to absolute zero deflection.
Corrosion Resistance: To protect against high-humidity microclimate cycles rising from underlying arena ice
sheet systems, all structural steel frames, wheel-tracks, fasteners, and connection hardware must feature
factory-applied chemical-resistant finishes.
Wheel and Tracking System: Non-marring, heavy-duty polyurethane wheels equipped with dual internal
sealed ball bearings. Tracking mechanisms must deploy linearly and flawlessly without ever scuffing,
scraping, or tracking black rubber deposits onto the underlying concrete coliseum floor slab.
Premium Decking Construction: To ensure long-term durability and eliminate structural deterioration from
liquid spills or humidity, the system must utilize an all-aluminum decking system. Decks, risers, and row steps
must be constructed from extruded or formed structural aluminum panels featuring a high-durability,
engineered slip-resistant textured aluminum surface. No exposed raw wood, structural plywood, or thin
thermoformed plastic-sheet overwraps are permitted anywhere on the platform deck.
E. MOTORIZATION & ELECTRICAL INTEGRATION
Friction Power Drives: System operation must utilize built-in, continuous-duty electric gear motors acting
directly on high-traction rubber drive rollers to ensure uniform, parallel tracking during extension and
retraction sequences.
Control Infrastructure: Provision of a flexible dual-control system including a heavy-duty, multi-button
pendant controller with an armored umbilical cord, alongside an encoded multi-channel wireless remote
controller.
Page 7 of 18
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
Safety Interlocks: Integrated automatic micro-switch travel tolerances, physical frame tracking sensors, and a
minimum of two (2) prominent, manual electronic safety emergency-stop triggers to arrest system movement
instantly upon obstruction contact.
F. CHAIR AND SEATING CRITERIA
1. Chair Construction & Ergonomics
Seating must consist of individual folding chairs featuring an automatic, quiet, gravity-assisted counter-balanced
seat return mechanism that ensures clear row passageways when unoccupied. Chair bodies must be constructed of
high-density, impact-resistant blow-molded or injection-molded UV-stabilized High-Density Polyethylene
(HDPE) outer protective shells.
2. Premium Upholstery & Cushioning Baseline
To eliminate product tier discrepancies during bidding, the "Base Bid" must include high-quality, professional
arena upholstery on all chair backs and seat cushions. Foam cushions must consist of high-density, molded
polyurethane foam. Bidding fabric must meet or exceed the following performance metrics:
Durability: Minimum 100,000 double-rubs utilizing the Wyzenbeek Method (ASTM D4157).
Treatment: Factory-applied stain-repellent, liquid barrier, and moisture-wicking technology.
Color Selection: The final fabric color will be selected post-award by the Venue Owner from the
manufacturer's complete standard color line. All standard color lines must be included in the vendor's base
pricing without upcharges.
3. Armrests & Accessories
Every individual seat must be equipped with a dedicated armrest. Shared center armrests are prohibited.
Intermediate and end armrests must be designed to swing out of the way or fold compactly when the platform is
retracted. Integrated cupholders must be molded directly into every armrest structure, requiring a minimum
chair spacing width of 20 inches to comfortably maintain OVG crowd-comfort parameters.
4. Identification Assets & Aisles
Each seat must feature a flush-mounted, tamper-resistant aluminum seat number plate centered on the top front
edge of the seat cushion. Each row end must feature a matching, prominent aluminum row letter plate. Aisles must
integrate mid-steps with high-contrast, slip-resistant safety nosing. Open ends of the telescoping system must
feature self-storing or fast-disconnect steel safety guardrails finished in an industrial semi-gloss black powder
coating.
G. DEMOLITION, INSTALLATION & TESTING
Logistical Demolition Mapping: The vendor handles all labor, lifting rigging, transport, and disposal sorting
required to remove existing hardware cleanly without disrupting active facility operations.
Sub-Floor Preparation: Vendor must thoroughly vacuum, pressure-clean, and inspect all underlying anchors,
concrete expansion joints, and concrete tracking paths to remove debris prior to installing new structural
components.
Precision Fitting & Anchoring: All framework framing lines must be aligned perfectly plumb, level, and
true. Platforms must be anchored using structural, professional-grade epoxied concrete anchors, strictly
honoring specified physical floor expansion allowances.
Certified Load Verification: Conduct rigorous cycle performance field tests simulating full structural dead
loads and lateral dynamic forces mimicking active, highly energetic arena crowds.
Page 8 of 18
Bid Number: IFB #27-18-CROWN Motorized Telescoping Seating System for Crown Coliseum
Operational Cycle Testing: Execute a minimum of ten (10) consecutive, flawless expansion and closure
sequences on every motorized bank to verify micro-switch tolerances, framework tracking, and safety sensor
limits.
Staff Operational Training: Provide comprehensive, hands-on instructional field training for Oak View
Group venue operators and facility maintenance staff. Deliver three (3) complete, factory-bound Operation &
Maintenance (O&M) manuals along with high-resolution digital schematics and wiring diagrams.
H. SYSTEM WARRANTY
The Vendor must provide a comprehensive, non-prorated, single-source factory warranty commencing directly from
the formal date of Substantial Completion. All replacement parts, corrective repairs, transport, and associated field
labor during the warranty terms shall be provided at zero additional cost to the Venue Owner or Oak View Group:
Structural Integrity Warranty (10 Years): Covering all structural steel columns, understructure framework
components, welds, mechanical linkages, and aluminum deck panels against structural failure, excessive
deflection, or permanent metal deformation under capacity crowd loads.
Electrical & Motorization Warranty (3 Years): Covering all continuous-duty electric gear motors, friction
power drive rollers, wireless and pendant control modules, internal wiring harness bundles, and safety
interlock micro-switches.
Seating & Component Warranty (5 Years): Covering individual HDPE folding chairs, foam cushions,
upholstery fabrics, gravity counter-balance mechanisms, row-lettering/seat-number assets, and aisle safety
guardrails against cracking, color fading, splitting, or mechanical return failure.
I. COLISEUM FLOOR PROTECTIONS & LIABILITY
Because this motorized telescoping system operates directly over a specialized, high-performance concrete coliseum
floor slab containing underlying refrigeration ice sheet piping systems, asset protection is of paramount importance to
this contract:
Pre-Installation Mapping: The Vendor and Venue Management shall co-inspect and map all pre-existing
floor conditions, micro-cracks, and expansion joint states prior to bringing demolition machinery onto the
floor.
Damage Liability: The Vendor assumes 100% financial liability for any structural cracking, deep gouging,
spalling, or surface marring of the concrete floor slab caused by demolition equipment, tracking systems, or
wheel load concentrations during installation and cycle testing.
Mandatory Remediation: Any floor surface damage caused by the Vendor's operations must be repaired
using industry-approved structural epoxy compounds and polished perfectly flat to the absolute satisfaction of
the Venue Owner. All remediation will be at the Vendor's sole expense, without causing delays to project
milestones.
J. PROJECT MILESTONES
The selected Vendor must commit to a rigid execution timeline from the date of contract award. Milestone
achievements are defined as follows:
Milestone 1 - Engineering Submission: Complete post-award engineering shop drawings, concrete track
anchor profiles, and certified seating yield layouts must be submitted for Venue Owner approval within
twenty-one (21) calendar days from the formal Notice to Proceed (NTP).
Page 9 of 18

With GovernmentContracts, you can:
Solicitation Number: 99-JD26005 Project Title: Conference Center AV Refresh Phase 2 Description: The
State Government of North Carolina
Bid Due: 12/11/2026
DN12243584 (WBS GMR14.HEN.1P, Etc) POC DN12243584 (WBS GMR14.HEN.1P, Etc) ID/IQ Work Zone Traffic
Division of Highways
Bid Due: 12/08/2026
Solicitation Number: 70020342 Project Title: Guilford County Sheriff Office Mechanical Yard Fence Description:
State Government of North Carolina
Bid Due: 12/10/2026
Project: Tool Storage Lockers for Rail Ref. #: 269- 2027-2120 Department: Metropolitan Public
City of Charlotte
Bid Due: 11/23/2026