| Project Title: | RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock |
| Description: | Cape Fear Public Utility Authority (CFPUA) requests statements of qualifications (SOQ) from consulting engineering firms for evaluating the existing condition of an existing pump station in the CFPUA system, PS-33 Shamrock. |
| Opening Date: | 11/5/2026 2:00 PM |
| Posted Date: | 10/8/2026 |
| Status: | Open |
| Department: | CAPE FEAR PUBLIC UTILITY AUTHORITY |
|
Solicitation Number
*
345-10/08/2026
|
Department
CAPE FEAR PUBLIC UTILITY AUTHORITY
|
Status Reason
Open
|
|
|
Opening Date
2026-11-05T14:00:00.0000000
|
Posted Date
*
2026-10-08T12:04:44.0000000Z
|
Primary Commodity Code
Civil engineering
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
No pre-submittal conference to be held
|
Solicitation Type
*
RFI
|
|
|
Owner
Teresa McPherson
|
|||
|
Description
Cape Fear Public Utility Authority (CFPUA) requests statements of qualifications (SOQ) from consulting engineering firms for evaluating the existing condition of an existing pump station in the CFPUA system, PS-33 Shamrock.
|
|||
Request for Qualifications
Professional Engineering Consulting Services
Condition Evaluation for the Replacement of
Pump Stations #33 Shamrock located on Kilarny Road
Cape Fear Public Utility Authority
Wilmington, North Carolina
October 7, 2026
General Information
Cape Fear Public Utility Authority (CFPUA) requests statements of qualifications (SOQ)
from consulting engineering firms for evaluating the existing condition of an existing pump
station in the CFPUA system, PS-33 Shamrock located at 116 Kilarny Road.
The project will generally consist of completing a Preliminary Engineering Report (PER),
surveying, preparing detailed design plans and technical specifications, permitting, and bidding
assistance. The outcome of this project will be final contract documents that are suitable for bidding
and construction. Engineering services for the construction phase may be negotiated at a later date.
Submission of a Statement of Qualification (SOQ)
Consulting engineering firms are invited to submit a Statement of Qualification to
CFPUA to be received no later than 2:00 PM on November 5, 2026. Submittals
received after this deadline will not be considered.
CFPUA will address questions regarding the RFQ until 2:00 PM on October 21, 2026.
Questions submitted after this time will not be addressed. Questions concerning this
advertisement should be directed to Ben Guerrieri, Procurement Manager, Cape
Fear Public Utility Authority, at bids@cfpua.org.
SOQ's shall be limited to 20-pages or less, excluding cover page, tabs, resumes
and appendices, 11x17 are allowed.
Firms shall submit their statement of qualifications for consideration in .pdf format to
bids@cfpua.org. Maximum file size for .pdf submission is 25MB. A reply will be sent to the
email address submitting the statement of qualifications to confirm receipt. It is the
submitting firms' responsibility to confirm that CFPUA has received statement of
qualifications via email. If email reply is not received from bids@cfpua.org, please call
910-332-6472 or 910-332-6651 before deadline for submission.
Submitted information shall comply with N.C.G.S. 143-64.31 through 64.34 (aka Mini
Brooks Act).
All SOQ's will be evaluated by a CFPUA selection team.
One firm will be selected from this request for qualifications.
1
Existing Conditions:
Pump Station 33 (Shamrock)
Address: 116 Kilarny Rd. Wilmington, NC
History: Original Station installed about 1980. (current age - 46 years +/-)
Operations: Two (2) Self Priming Hydromatic Pumps (Model 30 MP) 230/460V
Average Pump Run time per month: 55 hours
Pump Station Age: Approximately 46 years
Design Peak Pumping Rate: 80 GPM
Design Average Daily Capacity: 46,080 gpd
The pump station serves one existing community and will not require any additional
capacity.
Description of Services
CFPUA is pursuing professional engineering consultant services to assist in the design and bidding
for the upgrade or replacement of an existing sanitary sewer pump station.
Description of Services
The scope of work is expected to include the services described below.
Overall objectives of this project are outlined below:
1. Gather and evaluate available information provided by CFPUA and perform preliminary
field investigations as needed for cost estimation
2. Preparing a Preliminary Engineering Report
3. Prepare detailed design and specifications for bidding
4. Obtain all necessary permits and encroachment agreements if needed
5. Prepare sewer bypass plan
6. Provide bidding assistance, certified bid tabulation and letter of recommendation to
award
7. Construction administration and observation-based services to be determined at a later
date.
Schedule
The CFPUA selection team will place strong emphasis on a firm's ability to meet the
schedule of deliverables outlined below. The selected consultant will be expected to
complete final plans and specifications in accordance with the project schedule shown
below if not sooner. CFPUA will provide comments on all design submittals generally
within 2 weeks from the date received.
o Advertise RFQ October 7, 2026
o Consultants submit SOQ November 5, 2026
o Complete SOQ review and award November 19, 2026
o Complete Scope and Contract December 17, 2026
o Notice to proceed January 4, 2027
2
o Preliminary Engineering Report February 18, 2027
o Design June 18, 2027
o Permitting August 2, 2027
o Construction Bidding and Award September 1, 2027
Consultant Selection
CFPUA will follow a qualifications-based selection process. Consultants must
demonstrate their level of competence and qualification, and each sub-consultant's level
of competence and qualification, with respect to the listed evaluation factors for the
needed services.
SOQ's will be evaluated based on the following four (4) considerations and the level
of importance for each consideration. The SOQ shall be formatted consistent with the
evaluation consideration. Criteria shown under each of the four (4) considerations
are to be addressed in the SOQ. Consultant's may provide additional information, as
necessary.
3
1. Project understanding and approach (25%)
a. Understanding of project drivers and scope of work to be performed
b. Approach to keep the project on schedule
c. Description of the design team's quality control program
2. Relevant firm experience (25%)
a. Projects of similar size and scope
b. References and descriptions of similar projects
3. Overall staff experience proposed for this project (25%)
a. Project Manager to lead the design aspect of the project
b. Individual team members for each discipline and relevant experience
4. Record of success by the consultant (25%)
a. Managing design and construction costs within project budgets and
design estimates. Provide 5 previous projects indicating the engineer's
opinion of probable cost estimate compared to construction low bid.
A more detailed scope of work and fee schedule will be negotiated with the best qualified
firm. If negotiations are not successful with any selected firm, CFPUA will terminate
negotiations with that firm and initiate negotiations with the next best qualified firm.
When a fair and reasonable fee is established, a contract award recommendation will be
made to the CFPUA Board for its consideration.
Insurance Requirements
The following criteria will be deemed necessary for selection:
* The firm must meet the following insurance requirements. Workers
Compensation may be waived if firm has no employees.
3
* General Liability $1,000,000 per occurrence/$2,000,000 aggregate. Authority
must be additional insured and endorsement required.
* Workers Compensation $500,000/$500,000/$500,000. Waiver of
Subrogation against the Authority and endorsement required.
* Auto Liability Insurance $1,000,000 per occurrence combined single limits
applicable to claims due to bodily injury and/or property damage. Authority
must be additional insured and endorsement required.
* Professional Liability not less than $2,000,000 per loss.
Any firm wishing to be considered must be properly registered with the Office
of the Secretary of State.
Notification
The selected firms will be notified by telephone and/or email.
The CFPUA reserves the right to reject any and all Proposals.
Any questions concerning this advertisement should be directed to Ben Guerrieri,
Procurement Manager, Cape Fear Public Utility Authority, at bids@cfpua.org by
October 21, 2026 at 2:00PM. Questions submitted after this time will not addressed.
4

With GovernmentContracts, you can:
Solicitation Number: 274-605PS Project Title: EM Johnson WTP 605 High Service Pump Replacement
State Government of North Carolina
Bid Due: 12/08/2026
Solicitation Number: 274-POLNT Project Title: Poole Road Pump Station Improvements Description: Poole Road
State Government of North Carolina
Bid Due: 1/07/2027
REQUEST FOR QUALIFICATIONS PROFESSIONAL ENGINEERING SERVICES Browning Branch Booster Pump Station Project The
Waynesville town
Bid Due: 12/04/2026