| Location: | California |
|---|---|
| Posted: | Feb 2, 2026 |
| Due: | Mar 6, 2026 |
| Agency: | City of Pacifica |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: PACIFICA PIER REHABILITATION PROJECT
Addenda: 0
Release Date: 2/2/2026
Due Date: 3/6/2026
The City of Pacifica (“City”) is seeking proposals from qualified firms to provide professional design and engineering services for the Pacifica Municipal Pier Rehabilitation Project. The selected consultant will prepare complete plans, specifications, and estimates (PS&E) for the repair and rehabilitation of the existing reinforced concrete pier structure.
Located in San Mateo County just twelve miles south of San Francisco, Pacifica feels worlds away from it, yet is easily accessible from Highway 1. The most panoramic coastal town in the San Francisco Bay Area, Pacifica is famous for its six miles of scenic coastline, classic northern California beaches, breathtaking vistas, and charming ambience.
The City is nestled in between small valleys, with Sweeney Ridge to the east, Montara Mountain to the south and the Pacific Ocean’s rocky bluffs and sandy beaches to the west. Pacifica encompasses roughly 12.6 square miles, of which approximately one-half is publicly owned open space with panoramic views and a feeling of spaciousness rarely found in suburban areas. Several miles of coastal and ridge top trails tie Pacifica to neighboring communities.
The Pacifica Municipal Pier, constructed in 1973, is a 1,100-foot-long, L-shaped reinforced concrete pier extending from Beach Boulevard into the Pacific Ocean. It serves as a major coastal recreation facility for fishing, crabbing, and sightseeing. The pier has sustained structural damage over decades of wave exposure and storm events, including spalling, cracking, corrosion of reinforcing steel, and localized pile deterioration.
Recent post-storm assessments in 2023, and 2024 identified several high-priority areas requiring rehabilitation to ensure public safety and maintain functionality. The primary objective of this project is to restore the pier in kind by repairing or replacing damaged concrete components, improving corrosion resistance, and ensuring long-term serviceability.

With GovernmentContracts, you can:
...service area): Civil Engineering Construction Management & Inspection Energy & Sustainability...) Engineering Surveying ...
City of Foster City
Bid Due: 6/04/2026
...Environmental Engineering NIGP 92695 Water/Wastewater Conservation Services NIGP 92561 Land Development... NIGP 92588 ...
San Diego County Water Authority
Bid Due: 6/08/2026
...consulting firms with expertise in the following disciplines of professional engineering services. Firms.... ...
City of Anaheim
Bid Due: 6/05/2026
...Partner No Contact Organization City of Los Angeles Department Engineering Bureau, Public Works ...
City of Los Angeles
Bid Due: 7/01/2026