| Location: | Alaska |
|---|---|
| Posted: | Dec 4, 2024 |
| Due: | Jan 7, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12048925Q0008 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This work is for the reconstruction of approximately 2300 linear feet of the One Duck Trail, (5) rest areas and repairs to the existing alpine shelter. Major work items include but are not limited to; aggregate surfacing, boardwalk, stonework, drainage improvements, and demolition & removal of old trail structures. Option Item’s major work includes but is not limited to; (5) rest areas with benches, armored swales near shelter, improving existing foundation around shelter, and replacing several bunk and floor boards.
Base Bid described below:
BASE BID: Starting at station 0+00 beside existing Alpine Shelter and ending at station 27+01
1. Mobilization
2. Demolition and removal of existing trail structures
3. Stone retaining walls, stone riser steps, solid rock removal, and stone pitching.
4. Aggregate Surfacing
5. Boardwalk (Step and Run & elevated)
Option Items described below:
1. Rest Areas
a. (3) Benches on small aggregate pad beside trail alignment
b. (2) Rest Areas with spur trails, an aggregate pad and benches
2. Shelter Repairs
a. Armored swales around shelter for drainage improvements.
b. Cross bracing on existing shelter post foundation
c. Replace several cedar boards on bunks and floor.
The project is located on Prince of Wales Island, on the Tongass National Forest, Craig Ranger District. The trailhead is located along the Hydaburg Road approximately 2.5 miles after the Hollis-Klawock Highway intersection. The parking lot is on the west side of the road while the trail starts on the east side.
| Dec 3, 2024 | [Solicitation (Original)] One Duck Trail Reconstruction and Shelter Repairs |

With GovernmentContracts, you can:
Snowden Administration Building Facade INVITATION TO BID Alaska Court System Issuing Office Issue
State Government of Alaska
Bid Due: 10/21/2026
Solicitation Reference # Title Agency Available Date Due Date Available in eSupplier Palmer
State Government of Alaska
Bid Due: 9/22/2026
Haines Airport Rehabilitation- Construction Administration RFP Holders RFP #: 25273006 Southcoast Region ,
State Government of Alaska
Bid Due: 9/24/2026
+ 2026C043 - Bartlett Pool Renovation Click here to be added to the
City of Anchorage
Bid Due: 9/30/2026