| Location: | California |
|---|---|
| Posted: | Mar 12, 2025 |
| Due: | Apr 3, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RD25-13 |
| Publication URL: | To access bid details, please log in. |
Project Description: pavement resurfacing including Asphalt Concrete Hot Mix (ACHM) with Fiber over Asphalt Rubber Aggregate Membrane (ARAM), Public Access and Notice, Mobilization, Traffic Control and Construction Signing, Water Pollution Control, Roadway Preparation, Surface Preparation and Crack Treatment, Mill & Fill Existing Rumble Strips, Base Repair, Cold Milling, AC Taper with Key, AC Dike Repair, Tack Coat, Seal Coat, AC Swale, Shoulder Backing, Traffic Loops, Traffic Count Station, Pedestrian Push Button Assembly Post, Replace Pedestrian Push Button, Centerline Rumble Strip, Edgeline Rumble Strip, Concrete Pad, Concrete Curb and Gutter, Curb Ramps, Detectable Warning Surfaces, Survey Monument Frame Adjustment and Replacement, and Pavement Delineation and Striping, Rumble Strips, and appurtenant work.

With GovernmentContracts, you can:
...preparation and crack seal/fill, pavement delineation striping and signing, constructing asphalt berms..., surface ...
City of Mailbu
Bid Due: 6/18/2026
...preparation and crack seal/fill, pavement delineation striping and signing, constructing asphalt berms..., surface ...
City of Malibu
Bid Due: 6/18/2026