| Location: | Colorado |
|---|---|
| Posted: | Sep 16, 2025 |
| Due: | |
| Agency: | |
| Type of Government: | Federal |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
TOTAL SMALL BUSINESS SET-ASIDE
PROJECT NUMBER: CO OMAD 300(70)
PROJECT NAME: Minuteman Missile Access Road
PROJECT DESCRIPTION:
CO OMAD 300(70) - The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado.
In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling up to 156.582 miles of existing gravel Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force.
The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
SCOPE OF THE WORK:
The contract is to be fixed-price variable scope. The project includes up to 156.582 total miles of variable scope roadway reconditioning and re-graveling of existing aggregate surface roads.
The breakdown of the roads is:
69.2 miles of reconditioning and regraveling of aggregate surface roads within 28 segments in Weld County Colorado.
0.767 miles of reconditioning and regraveling of aggregate surface roads within 2 segments in Laramie County Wyoming.
29.474 miles of reconditioning and regraveling of aggregate surface roads within 10 segments in Logan County Colorado.
56.263 miles of reconditioning and regraveling of aggregate surface roads within 26 segments in Kimball County Nebraska.
.878 miles of reconditioning and regraveling of aggregate surface roads within 1 segment(s) in Laramie/Kimball County Nebraska.
PRINCIPAL WORK ITEMS:
ANTICIPATED SCHEDULE:
DISCLOSURE OF MADNITUDE: $5,980,000.00

With GovernmentContracts, you can: