January 13, 2026
REQUEST FOR PROPOSAL
FOR
CONSTRUCTION MANAGEMENT SERVICES FOR
WESTSIDE ROAD BRIDGE OVER CANYON HOLLOW CREEK REPLACEMENT
PROJECT
FOR THE
CITY OF REDDING, CALIFORNIA
(Schedule Number 5666)
In accordance with the provisions of the Municipal Code of the City of Redding, sealed
proposals must be submitted to the City Clerk’s 3rd floor office located at City Hall, 777 Cypress
Avenue, Redding, California 96001 prior to 3:00 p.m. PT, Friday, February 13, 2026, for
furnishing the City of Redding a proposal for providing Construction Management Services for
Westside Road Bridge Over Canyon Hollow Creek Replacement Project, per specifications and
general conditions.
PROPOSALS RECEIVED AFTER THIS TIME AND DATE MAY NOT BE ACCEPTED
OR CONSIDERED.
The said proposals will be opened at 3:00 p.m. PT, on Friday, February 13, 2026, in the
designated City Hall Conference Room as posted in the main lobby of City Hall, 777 Cypress
Avenue, Redding, California.
The bidder shall provide the original (unbound), four (4) copies and a USB drive with a PDF
copy of the proposal. Electronic submission of proposals will not be allowed. One (1) set of the
Fee Proposal is to be submitted in a separate, sealed envelope. Proposal package may be
obtained
from
the
City’s
website,
https://www.cityofredding.gov/government/departments/purchasing/bid_opportunities.php. The
City will award any resulting contract in a manner consistent with the City Purchasing Ordinance.
The cut-off date and time for receiving questions regarding this bid is 5:00 p.m. PT, on
Friday, January 30, 2026. All inquiries must be made in writing and may be submitted to the email
address shown below.
THE CITY OF REDDING
Purchasing Division
Michelle Kempley, Purchasing Officer
mkempley@cityofredding.gov
NOTE
If a potential bidder/proposer received this solicitation document through
some means other than surface mail from the City of Redding (such as from the City
of Redding Internet web site, or from another prospective bidder/proposer), it is the
responsibility of the potential bidder/proposer to advise the assigned City of Redding
Purchasing contact of its intention to submit a bid/proposal so that any addenda or
other correspondence related to this solicitation will be sent to the potential
bidder/proposer. When contacting the Purchasing Division, the bidder/proposer shall
provide the solicitation number located on the cover page of this document.
Transmittal of this information must be in writing, by U.S. Mail, or e-mail.
Transmittal of this information via telephone is not acceptable.
Please submit bid/proposal as directed in the RFP package. Forward to:
City of Redding
City Clerk
777 Cypress Avenue
Redding, CA 96001
Proposals must be received by the City Clerk’s office prior to 3:00 p.m. PT on the date
indicated below. Mailing envelope is to be clearly marked on the outside with the following
notation:
“Proposal for Schedule No. 5666; opening at
3:00 P.M., on Friday, February 13, 2026”
Note: Signatures must be legible, indicating full first and last name.
The City of Redding
Purchasing Division
CITY OF REDDING
REQUEST FOR PROPOSALS
FOR CONSTRUCTION MANAGEMENT SERVICES FOR
WESTSIDE ROAD BRIDGE OVER CANYON HOLLOW CREEK REPLACEMENT
PROJECT
SCHEDULE NO. 5666
I. INTRODUCTION
The City of Redding (City) is soliciting proposals for construction management
services including inspection, materials testing, and resident engineering duties for
the Westside Road Bridge Over Canyon Hollow Creek Replacement (Project). The
included location map shows the general location of the project in the City of
Redding. Funding for the Project is by a combination of 88.53% Federal Highway
Bridge Program (HBP) and 11.47% City of Redding Transportation Impact Fee
(TIF) funds. The federal project number is BRLS-5068(038).
The plans, specifications, and estimate for the Project are being prepared by
Dokken Engineering and City staff. The existing Westside Road Bridge (State
Bridge No. 06C-0071) over Canyon Hollow Creek was originally built in 1957. The
36-foot by 85-foot bridge is a 3-span continuous reinforced concrete slab bridge
with reinforced concrete pier walls and reinforced concrete diaphragm type
abutments all of which are supported on spread footings. Caltrans Bridge
Inspection Reports list the bridge as “Functionally Obsolete.”
The bridge is located approximately one-tenth of a mile south of Canyon Creek
Road and carries Westside Road which is classified as a major urban collector.
The Project includes (quantities are approximate), replacing the existing bridge
with an 84-feet-long, 3-Span, Cast-In-Place Reinforced Concrete Slab Bridge with
an ultimate width of 41-feet. The bridge work includes removal of the existing
bridge, 1,450-feet of 30-inch cast-in-drill-hole (CIDH) concrete piles, 444 cubic
yards(cy) of structural concrete, 122,000 lbs of bar reinforcing steel, 331 cy of
structure excavation, 140 cy of structure backfill, 124-feet of concrete barrier
(type 732SW), 114-feet of concrete barrier (type 836), tubular handrailing and
tubular bicycle railing, 20-inch ductile iron pipe, REU electrical conduits, 2” PGE
gas, and 138 cy of rock slope protection. The road work includes 700 cy of
roadway excavation, 900 tons of asphalt concrete, 500 cy of aggregate base, 100
cy of minor concrete, 62-feet of Midwest Guardrail, 230-feet of 20-inch DIP,
removal of existing asbestos cement pipe, 230-feet of chain like fence, 1,300-feet
of temporary railing, signs and striping. There will be four primary stages of
construction including the bridge replacement and road approach work using
typical half-width construction methods.
The current construction cost estimate, not including contingencies or construction
management, is about $3.3 million. The will be 250 working days for construction
of the Project.
Page 2 of 11
The scope of work includes Services Prior to Construction, Services During
Construction and Services After Construction. A Consultant Services Agreement
will be executed for the combined services. It is the intent of the City to hire a
consultant who will provide complete construction management, resident
engineering, perform materials testing and inspect the construction of the project
with minimal support from City personnel.
II. REVIEW OF BACKGROUND INFORMATION
The following items will be available on the City’s Public Works Bid Opportunities
web page shown below.
Bid Opportunities Bid Schedule 5470
• Plans
• Project Specifications
• Project Categorical Exemptions/Categorical Exclusion
• City of Redding Construction Standards
Construction Standards (CORCS)
III. GENERAL
The Consultant shall play an active role in the management of the project to
maintain the project schedule and budget and to protect the City against defects
and deficiencies on the part of the Contractor. Services provided during
construction will, in general, consist of project management, construction contract
administration, construction inspection, and materials testing including source
inspection as needed. In doing so, the Consultant will serve as the focal point
for coordination between the Contractor, the City, the Design Consultant,
regulatory agencies, and utility companies. These services shall be in
accordance with the City’s Quality Assurance Plan (QAP).
The Consultant’s work plan and expected level of effort should consider the
schedule imposed on the Contractor, including what can be reasonably expected
for overtime inspection.
The Consultant will be responsible for their own office and administrative space
including telephone, restroom and computer facilities. The City will not provide
these facilities.
The consultant shall assure the City that it will comply with the Americans with
Disabilities Act (ADA), as well as all applicable regulations and guidelines issued
pursuant to the ADA (42 U.S.C. 12101 et seq.).
REQUEST FOR PROPOSALS
FOR CONSTRUCTION MANAGEMENT SERVICES FOR
WESTSIDE ROAD BRIDGE OVER CANYON HOLLOW CREEK REPLACEMENT PROJECT
Page 3 of 11
The Consultant must comply with Government Code Section 8355 in matters
relating to providing a drug-free work place.
The Consultant shall reference the attached links and Caltrans Office Bulletin 22-
06 for Certification of Indirect Costs and Financial Management System that
replaces the previous Exhibit 10-K form and also provides a replacement for
Exhibit 10-A, A&E Consultant Financial Document Review Request.
Instructions for Requesting A&E Consultant Indirect Cost Rate (ICR) Financial
Document Reviews (FDR) | IOAI
Certification of Indirect Costs and Financial Management System
Financial Document Review Request Form
IV. SCOPE OF SERVICES
Prior to Construction
1. File Review – Review project files and plans including quantity calculations;
memorandums to Resident Engineer; geotechnical reports; hydraulic studies;
discovery plans; etc.
2. Schedule Review – Prepare a tentative schedule that identifies construction
stages, utility relocations, notification time lines for permits and agreements, and
all items that will be submitted by the Contractor for review and approval.
3. Pre-construction Conference – Organize a preconstruction conference with the
Contractor, Subcontractors, City, to discuss the work involved, administrative
matters, labor compliance, safety and accident prevention, answer questions
from the contractors, and address issues that need to be resolved before work
commences.
During Construction
4. Construction Meetings – Conduct regularly scheduled construction status
meetings to review project schedule, potential change orders, progress
payments, and future material testing needs; facilitate decision making and
discuss issues that have the potential of adversely affecting the project budget,
schedule, or product. Consultant shall prepare meeting agenda in consultation
with City Construction Manager.
5. Coordination – Coordinate all administrative, inspection, and testing activities of
REQUEST FOR PROPOSALS
FOR CONSTRUCTION MANAGEMENT SERVICES FOR
WESTSIDE ROAD BRIDGE OVER CANYON HOLLOW CREEK REPLACEMENT PROJECT
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.