| Location: | Utah |
|---|---|
| Posted: | Apr 13, 2025 |
| Due: | May 2, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 525003054 |
| Publication URL: | To access bid details, please log in. |
Project Description: Construction of a two-stage foul air biotower and associated controls and piping on a 0.33-acre site, including grading of the site, an access driveway, site fencing and gates, landscaping, connections to existing water, sewer, & power utilities, and approximately 430 feet of a 24” HDPE foul air line connecting to a sewer manhole in 1000 West.
Engineering Estimate: $1,869,175

With GovernmentContracts, you can:
...for the E-6 Airborne Warning And Control System (AWACS). B. PROGRAM REQUIREMENTS The ...
DEPT OF DEFENSE
Bid Due: 6/22/2026
...operational, and code-compliant electronic rolling security gate system, including an access... control pedestal ...
State Government of Utah
Bid Due: 7/03/2026
...a precast water control structure, catwalk, concrete access ramps, new water supply piping, ...
State Government of Utah
Bid Due: 6/23/2026
...to support the replacement of legacy test equipment for the E-6 Airborne Warning ...
DEPT OF DEFENSE
Bid Due: 6/22/2026