EXT MOH | Balboa Res. Infrastructure GC RFP

Location: California
Posted: Oct 18, 2024
Due: Nov 19, 2024
Agency: City of San Francisco
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
Solicitation No: SFGOV-0000010077
Publication URL: To access bid details, please log in.

EXT MOH | Balboa Res. Infrastructure GC RFP

This version is no longer active. For the most recent version of this sourcing event, enter the event ID on the View Opportunities page.
If submitting a bid or proposal to this Sourcing Event, please ensure you have viewed the most recent version of this event as the solicitation documents and requirements may have been updated and revised from those displayed on or accessed from this page.

Start Date:
10/18/2024 10:00AM PDT
Please read the Details section for information on how to bid on this opportunity
Details
The Balboa Reservoir (Reservoir) is a 17-acre site located across from City College. The masterplan calls for a series of 7 multifamily buildings and approximately 100 for sale townhomes for a total of 1100 units. The sponsor of this project is BRIDGE Housing and is requesting for the phase 1 infrastructure portion of the masterplan. The work under this bid will include demolition, grading, street and transportation improvements, open space improvements, combined sewer system, stormwater management, and pad readiness for Buildings E and A as described in the SIP plans and specifications. The work designed and included in the SIP is necessary for the fully functional public infrastructure, which will serve Building E, Building A, and future buildings on the site.

The project has a 25% SBE goal. A 10% ratings bonus shall be applied to SBE’s proposed as the prime contractor. A 7.5% rating bonus to a Joint Venture with SBE prime contractor participation that equals or exceeds forty percent (40%).
Contractor’s bid proposal for each bid package must be accompanied by the following documents in order to be considered a valid bid by the Owner’s Representative. Incomplete bids may be rejected.

Bid Date: No earlier than 1:45 PM on the bid date and no later than 2:00 PM on the bid date, the following documents must be received via email as separate PDF attachments by the entire email distribution list below:

a.        Bid Summary, Bid Form and Schedule of Values (Attachment 1a&b)
b.        Bid Bond or Irrevocable Letter of Credit (Attachment 1c)
c.        Subcontractor Listing (Attachment 2)
d.        Bidder narrative of its work scope inclusions/exclusions that corresponds to their Bid proposal.
e.        Please note that the Bid Schedule of Values includes allowances for anticipated items of work that not fully quantifiable at time of bid.  Allowances are controlled by the Owner. If any of the allowance items are determined to be necessary to accomplish the project, the Owner will control the allowance will request a change order to perform the work.
Pre-bid Site Walk:                  To Be Determined
Pre-bid RFIs Due:                  October 29, 2024
Response to Pre-bid RFIs:         November 5, 2024
Bids Due:                        November 19, 2024
Interviews:                        Week of 01/20/24 and 01/27/24
Anticipated Award                February 2025

Please see attachment 0 for further Bid Instructions. Bid attachments can be found at the following URL:

https://bridgehousing4-my.sharepoint.com/personal/etheurer_bridgehousing_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fetheurer%5Fbridgehousing%5Fcom%2FDocuments%2FDocuments%2FSHaring%2FBalboa%20Infrastructure%20GC%20RFP%20Documents&ga=1

For questions, please email both Andrew Johnson and Ernie Theurer. Their information is below.

Andrew Johnson, Senior Project Manager BRIDGE Housing - anjohnson@bridgehousing.com

Ernie Theurer, Associate Project Manager BRIDGE Housing - etheurer@brigdehousing.com
.
.
.

Event ID: SFGOV-0000010077

Format/Type: Sell Event RFx

Round: 1

Version: 1
Payment Terms
My Bids : 0
Edits to Submitted Bids : Allowed
Multiple Bids : Allowed
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Overpass Eight Mile Road at Pixley Slough Bridge West Lane at Calaveras River ...

City of Stockton

Bid Due: 6/19/2026

...Improvements (Drawing Nos. 1-3514 and 1-3536) Project consists of demolition of the Red ...

City of Los Angeles

Bid Due: 6/11/2026

...Camp Slough Arch Airport Overpass Eight Mile Road at Pixley Slough Bridge West ...

City of Stockton

Bid Due: 6/19/2026

...Airport Overpass Eight Mile Road at Pixley Slough Bridge West Lane at Calaveras ...

City of Stockton

Bid Due: 6/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.