| Location: | North Carolina |
|---|---|
| Posted: | Jan 28, 2025 |
| Due: | Feb 26, 2025 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-ITBCon-17 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of retrofitting existing stormwater detention basins including constructing forebays to increase pretreatment of solids and create sheet flow through the basin, removing and replacing of existing turf grass in the bottom of the basins with a hardier herbaceous vegetative mix that provides more treatment, and modification of outlet structures of basins that increase retention time within the basins to increase pollutant removal.

With GovernmentContracts, you can:
...Back Flow Devices Event: 12382-0 Reference: Water Resources Type: INFORMAL BID Open Date: ...
City of Greensboro
Bid Due: 6/25/2026
...of the WTP; with Lagoon 2 receiving the vast majority of this flow. ...
City of Durham
Bid Due: 6/12/2026
...surface flow and unnamed tributaries to Stirrup Iron Creek, which has a NC ...
State Government of North Carolina
Bid Due: 6/25/2026