ITB: EMS 3 Generator Replacement

Location: North Carolina
Posted: Aug 25, 2026
Due: Sep 25, 2026
Agency: County of Henderson
Type of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Title Bid/RFP Closing Date Bid/RFP Status Files View Bid Awarded To
ITB: EMS 3 Generator Replacement Fri 9/25/26
Open - accepting bids and proposals
View Details

Attachment Preview

Project: EMS STATION # 3 Standby Emergency Generator Installation
Specifications
Demo existing 200 amp meter base, and wiring through wall to existing 200 amp main
panel. Patch holes in exterior wall, and seal hole in back of exiting Panel A. Remove
Utility PVC conduit to below grade and transition to Rigid galvanized conduit to New
Meter Main Combination Panel above grade.
Demo existing generator and turn over to owner
Demo existing generator pad.
.
Demo existing Generac automatic transfer switch and turn over to owner. Remove
generator cable along wall and patch holes in wall. Interior, and exterior.
Label and save circuitry from Generac automatic transfer switch, and rework circuits to
new sub panel B.
Install New 120/240V single phase, 3 wire, service entrance rated, 200amp Meter/Main
Breaker Combination Panel with 3/0 feed through lugs to feed new Automatic Transfer
Switch. (Include two 20 amp single pole circuit breakers for generator engine block
heater, and battery charger, and 4 blank spaces for future exterior equipment)
Install two new ground rods, and new bare # 6 copper grounding electrode conductor if
existing can't be located.
Install New 200 amp 120/240V single phase Nema 3R Automatic Transfer Switch (ATS)
along side New Service Meter Main Combination panel.
Install 2" rigid conduit nipple with Meyers hub with bonding bushing between Meter
Main and Automatic Transfer Switch. Install 3 # 3/0 thhn copper conductors, and 1 # 6
green copper conductor.
Install 1" conduit with 8 # 14s with ground from Automatic Transfer Switch to Generator
for controls and signal conductors
Install 1" conduit from Main Meter Combination panel with 4 # 12 thhn conductors with
1 # 12 green thhn equipment grounding conductor. (One block heater circuit, and one
battery Charger Circuit.)
Install 2" rigid conduit with Meyers hubs and 3 # 3/0 thhn copper conductors, and 1 # 6
green copper grounding conductor from New Automatic Transfer switch to existing
200amp Main Panel A. Use aluminum LBs to penetrate Wall. No PVC conduit or fittings
will be accepted.

In existing 200amp Main Panel A separate grounding conductors, (Neutral) grounded
conductors, and remove bond between ground and neutral as it is now a sub panel. Install
ground bar if necessary for separation of conductors.
Install a New Sub Panel B 200amp buss, 120/240V, single phase, 40 circuit Main Lug
only alongside existing 200amp Main Panel A
Install 100amp 2 pole circuit breaker in existing 200amp Main Panel A to feed New Sub
Panel B.
Install 1 12" EMT Nipple with Compression connectors and bonding bushings, 3 # 3 thhn
copper conductors, 1 # 6 green copper conductor between Main Panel A and New Sub
panel B.
Install 2" pvc conduit underground from generator to 200amp Automatic Transfer
Switch, with 3 # 3/0 thhn copper conductors, and 1 # 6 green thhn copper service
entrance feeder conductors. Where conduit is above ground transition to Rigid Conduit
with Meyers hub connector to Automatic Transfer Switch.
Install New 120/240V, Single Phase, 50 KW Natural Gas Generator. Include sound
attenuated weather proof cover, startup, testing, training, and 4hr load bank test. Include
digital programmable screen at generator, with temp alarm, coolant alarm, oil alarm, etc..
include programable weekly test operation at owners desired time. Include 5 contacts for
owner monitoring capabilities. Generator running, Generator fail, Phase loss, two spares
for future. Include 5 year manufacturer warranty, and 1 year complete warranty.
Generator to be Kohler, Cummins, Caterpillar, or Generac.
Install ground rod at generator, and connect a # 4 bare copper conductor to frame bond to
Grounding electrode system.
Install 12" concrete pad with # 5 rebar matt 12" on center. Pad to extend 12" past each
side of generator. Anchor generator with 5/8" x 5" minimum stainless steel concrete
anchors at each base hole. (Or to manufacturer requirements whichever is larger)
Ground and bond new service and bond building to meet NEC.
Include gas piping by licensed plumber under this contract. Gas Meter to be supplied by
natural gas supplier. Consult with generator supplier, gas supplier, and plumbing
contractor to assure correct piping for generator to operate as it should.
Note:
All exterior conduit above ground to be rigid galvanized conduit threaded and Meyers
weatherproof hub connector type connections. Bonding lug on one end of each conduit
entry.

All underground to be PVC schedule 40 conduit with transition to rigid galvanized 90
degree elbows and rigid conduit above grade. No PVC will be accepted above grade.
All interior conduit shall be EMT conduit with insulated throat steel compression
connectors, and steel compression couplings.
Strap and fasten all conduit per NEC.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.