Forest Hills Lift Station Replacement and Whitehills Lift Station Bypass NEW!

Location: Michigan
Posted: Sep 11, 2025
Due: Oct 2, 2025
Agency: Meridian charter township
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Forest Hills Lift Station Replacement and Whitehills Lift Station Bypass
  • Department: Public Works
  • Start Date: 09/11/2025
  • Close Date: 10/02/2025 11:00 AM

Meridian Township is requesting proposals for the replacement of the Forest Hills Sanitary Lift Station and the installation of a permanent bypass standpipe at the Whitehills Sanitary Lift Station.

Bids are solicited on a unit price basis. The work involves the following major bid items:

FOREST HILLS LIFT STATION REPLACEMENT

  • Removal of an existing Lift Station including all hardware and plumbing;
  • Installation of a new Lift Station including:
  • Wet Well, Valve Vault, Control Panel, Pumps, Generator and all plumbing, conduits, etc;
  • Installation of three new 48” Sanitary Manholes;
  • Installation and connection of the Pressure Sewer (6”) to the Station;
  • Installation and connection of the 12” Gravity Sewer to the Station;
  • Installation and connection of the proposed 10” and 8” Gravity Sewer to the proposed Sanitary Manholes;
  • Bypass Pumping of the Lift Station (156 gpm, peak hourly flow); and,
  • Dewatering of the construction zone.

Proposals shall include the furnishing of all labor, material, and equipment to complete the project, except for

the following equipment which will be furnished by Meridian Township:

o Two FLYGT Pumps, their lifting assembly, all check and gate valves.

o Control Panel and junction box.

o Generator: Natural Gas Standy Genset.

WHITEHILLS LIFT STATION BYPASS 2026

  • Installation of the permanent Bypass Standpipe including a live tap of the 12” force main, 6” resilient seated gate valve, and a 6” bypass standpipe with two 90 degree ductile iron bends, and a 2 ½” male quick connect with dust cap

Work on the project may commence after issuing the Notice to Proceed with the anticipated start of construction being April 1st, 2026. The project shall be substantially completed by May 15th, 2026. Restoration shall be completed by June 1st, 2026. Final completion of the restoration shall be done by June 15th, 2026.

Forest Hills and Whitehills Lift Station - Contract Book

Whitehills Lift Station Bypass - Bid Plans

Forest Hills Lift Station Replacement - Bid Plans

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.