| Location: | Massachusetts |
|---|---|
| Posted: | Mar 5, 2025 |
| Due: | Apr 2, 2025 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
Construction of a wood framed drinking water treatment facility with board and batten style metal siding, standing seam metal roof, and slab-on-grade foundation with a frost wall. The facility will be equipped with ancillary piping and chemical feed systems, two ion exchange vessels for PFAS removal, analyzers, VFD, electrical, lighting, heat pumps and unit heaters, propane water heater, half bathroom, laboratory bench and sink, and electrical room. Certain components of the ion exchange PFAS treatment system are furnished under a separate contract and are to be installed under this contract as shown on the design plans and described in these specifications. Project includes replacement of the vertical turbine pump in Fryeburg Water Company Well 2 and associated piping changes in the Well 2 building as shown on the design plans. Site work will include demolition of an existing garage building, grading, site piping, new buried fiber optic line and VFD cable, gravel driveway, propane tank, floor/sanitary drains and holding tank, drywell and underground electrical service as shown on the design plans.

With GovernmentContracts, you can:
...Header Information Bid Number: BD-22-1353-WILMT-WILMT-130438 Description: Industrial Way Pump... Flag: No Purchase Method: ...
Commonwealth of Massachusetts
Bid Due: 7/09/2026
...Title Number Start Date End Date Status Industrial Way Pump Station and Force ...
Wilmington town
Bid Due: 7/09/2026
...Title Number Start Date End Date Status Industrial Way Pump Station and Force ...
Wilmington town
Bid Due: 7/09/2026