| Location: | Pennsylvania |
|---|---|
| Posted: | Jul 23, 2025 |
| Due: | Aug 26, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Millersville University, Lancaster County |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is a rebid with reduced scope. Work under this project entails renovating approx. 11,000 SF to provide improvements to the stadium locker rooms and complex. General Construction work will consist of selective demolition, sitework, concrete, masonry, drywall partitions, ceilings, ADA restroom finishes, and interior finishes. HVAC work includes new HVAC systems and controls. Plumbing work includes water heater, misc. piping, fixtures, and accessories. Electrical work consists of power, wire and conduit, new lighting, and fire alarm system. Low voltage cabling and devices for IT data systems is by MU Contractor.
Mandatory Prebid Meeting – July 29, 2025, 10:00 AM Palmer Building. Download the campus parking pass.
Separate Prime Contractors: General Construction, Plumbing, HVAC and Electrical
Prevailing Wages are applicable

With GovernmentContracts, you can:
...-in cooler and freezer, resilient wall base, and associated electrical work including lighting, ...
Reading Area Community College
Bid Due: 7/29/2026
...and power and control cabling must be installed as specified and as required ...
DEPT OF DEFENSE
Bid Due: 7/28/2026
...power /electrical work for the dry cooler and associated systems. ..., and controls ...
PennBid
Bid Due: 8/03/2026
...and routing of new electrical cable and mechanical pipe.Three (3) new hydraulic power ...
DEPT OF DEFENSE
Bid Due: 7/28/2026