| Location: | South Dakota |
|---|---|
| Posted: | Jul 8, 2026 |
| Due: | May 19, 2026 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF26B000005 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT DESCRIPTION:
The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area.
SCOPE OF THE WORK:
The project will consist of removal of excavating the existing parking lot’s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities.
PRINCIPAL WORK ITEMS:
| Apr 17, 2026 | [Solicitation (Original)] SD FLAP SDGFP PARKING(1) North Point Parking Lot |
| Apr 28, 2026 | [Solicitation (Updated)] SD FLAP SDGFP PARKING(1) North Point Parking Lot |
| May 11, 2026 | [Solicitation (Updated)] SD FLAP SDGFP PARKING(1) North Point Parking Lot |
| May 13, 2026 | [Solicitation (Updated)] SD FLAP SDGFP PARKING(1) North Point Parking Lot |
| May 15, 2026 | [Solicitation (Updated)] SD FLAP SDGFP PARKING(1) North Point Parking Lot |
| May 19, 2026 | [Solicitation (Updated)] SD FLAP SDGFP PARKING(1) North Point Parking Lot |

With GovernmentContracts, you can:
..., Construction Safety Phasing Plan, 1000 CuYd of Unclassified Excavation, 100 CuYd of ...
City of Brookings
Bid Due: 7/30/2026
..., Construction Safety Phasing Plan, 1000 CuYd of Unclassified Excavation, 100 CuYd of ...
City of Brookings
Bid Due: 7/30/2026
...to DANR for a closure letter. New work includes backfilling the excavation to ...
Federal Agency
Bid Due: 7/17/2026
...includes backfilling the excavation to 95% standard proctor density, grading for a new ...
JUSTICE, DEPARTMENT OF
Bid Due: 7/17/2026