| Location: | Texas |
|---|---|
| Posted: | Jul 8, 2026 |
| Due: | Jul 9, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | PANMCC-26-P-047957 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
UPDATE 08 JUL 2026: Amendment 0001 has been posted to this solicitation. The purpose of this amendment is to revise the technical specifications to include a requirement for Spot Size: 50 microns. Please see the attached SF-30for full details. Offerors must formally acknowledge receipt of this amendment in their quote submission.
Xact Metal 200G Metal 3D Printer System (With Installation and OEM OnSite Training) Complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEMled operator training, and operational verification. System shall be configured and supplied with:
Laser Configuration: Single (1) 400-Watt Laser Build Height: Extended Build Height (11.5") Reactive Enabled: Supports safe processing of aluminum and other reactive metals Glove Box: Integrated powderhandling glove box. Sieving Station: OEM powder sieving station for material reclamation. Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation/combustion hazards.
Installation Services: Onsite unboxing, physical setup, utility connection, and system calibration /verification by certified OEM technicians at Fort Hood, TX. OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting.
All questions must be submitted in writing to the POCs listed below no later than 11:59 pm (CST), 6 July 2026.
marvin.e.hopkins4.mil@army.mil
donelle.h.white.mil@army.mil
jasper.l.cruz.mil@army.mil
| Jun 29, 2026 | [Solicitation (Original)] 13 ACSC 3D Metal Printer |

With GovernmentContracts, you can:
...Interior and Exterior Window Cleaning Services Solicitation ID: 601340000066179 Due Date: 7/17...
State Government of Texas
Bid Due: 7/17/2026
...Project: Interior and Exterior Window Cleaning Services Ref. #: 601340000066179 Department... quarterly interior ...
State Government of Texas
Bid Due: 7/17/2026
...Follow (Updated) Amendment 1: Laundry and Dry Cleaning Services - Fort Bliss, TX ...
DEPT OF DEFENSE
Bid Due: 7/27/2026
..., Cleaning and Restoration Certification Water Damage Restoration and Applied Mold Restoration... for ...
DEPT OF DEFENSE
Bid Due: 7/17/2026